Method for performing large-gradient deviated well construction by using full-section needle beam trolley and needle beam trolley
A needle-beam trolley and large-slope technology, which is applied in shaft lining, shaft equipment, earthwork drilling and mining, etc., can solve problems such as inability to guarantee quality and safety, complicated construction technology, and slow construction progress, so as to save manpower and time costs, The construction process is simple and the effect of avoiding potential safety hazards
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] Below in conjunction with accompanying drawing, the present invention is described in further detail:
[0025] Such as figure 1 As shown, in the method of using a full-section needle beam trolley for large-slope inclined shaft construction according to the present invention, the full-section needle beam trolley 2 includes a needle beam 17 and a mold body 31, and the needle beam 17 is placed in the mold body 31 In the phantom frame 26 and can move axially relative to the phantom 31, the included angle between the steep slope 1 and the horizontal plane is 20°; the method includes a needle beam guiding method, a needle beam trolley pulling method , Needle beam trolley stabilization method and concrete pouring method.
[0026] Such as Figure 4 with Figure 5 As shown, in the needle beam guiding method, the pulley block of the needle beam 17 adopts two double-wheel pulleys 25 and three single-wheel pulleys 24 to form a running system, and a total of 8 sections of guide w...