[0016] Embodiment one: if figure 1 As shown, the average thickness of the coal seam in a certain mine is 1.5 m, the average dip angle is 6°, and the hardness of the coal seam is f=2; the immediate roof is light gray medium-grained sandstone with an average thickness of 2.28 m; the old roof is gray-black sandy mudstone with an average thickness of 5.33 m . Adopt roof directional cutting seam to keep entry along the gob. On the 30 m ahead of the working face of the wind tunnel, 8 hydraulic fracturing holes 3 arranged in a plane and linear arrangement are constructed one by one on the vertical roof of the side road side of the succeeding working face. The diameter of the holes is 32 mm, the hole depth is 5 m, and the hole spacing is 0.5 m. , followed by construction along the advancing direction of the working face. After the construction of the 8 boreholes, the 8 boreholes 3 are sealed one by one with the hole sealer 4, and the water injection pipelines 7 are connected respect...
Embodiment 2
[0017] Embodiment two: if figure 2 As shown, the average thickness of the coal seam in a certain mine is 2.64 m, the average dip angle is 2°, and the hardness of the coal seam is f=2.7-3.7; , with an average thickness of 4.24 m and a hardness of f=6.3. The directional hydraulic fracturing technology is used to control the hard roof, and five hydraulic fracturing boreholes 3 are linearly arranged at an elevation angle of 45° in front of the oblique working face of the coal wall, with a diameter of 42 mm and a depth of 9.2 m. 1 m, and construct along the direction of the working face in sequence. After the construction of the 5 boreholes, use the hole sealer 4 to seal the 5 boreholes 3 one by one, and connect the water injection pipeline 7 respectively, and the water injection pipeline 7 is connected to each borehole 3. Water injection valves 5 are provided at the openings With the pressure gauge 6, five boreholes 3 are connected to the equal flow divider 8 connected to the w...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com