Pollution control method for urban suburb eutrophication water body
A technology for eutrophication and pollution control, applied in chemical instruments and methods, multi-stage water/sewage treatment, water/sludge/sewage treatment, etc. Pollution and other problems, to avoid incomplete or continuous operation, enhance biodegradability and adsorption, and promote metabolism
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Embodiment 1: The pollution control method of eutrophic water body in Dianchi Lake, the specific content is as follows:
[0037] 1. Overview
[0038] (1) Dianchi Lake: Under the normal high water level (1887.4m) of Dianchi Lake, the water surface area of Dianchi Lake is 309.6km 2 , with a total storage capacity of 1.56 billion m 3 , which is divided into north and south by an artificial dyke (sea ridge) in the north, the north is called Caohai, and the south is called Waihai. Caohai covers an area of 7.3km 2 (excluding the two separated water bodies: Dongfeng Dam and Laogan Fish Pond), accounting for 3.5% of the area of Dianchi Lake, with a water storage capacity of 22.58 million m 3 , 1.5% of the total water storage capacity of Dianchi Lake. The outlet of Caohai Sea is an artificial tunnel—Xiyuan Tunnel, with a water change cycle of about 3.5 months; the outlet of the outer sea water is the Haikou Zhongtan Sluice, which is discharged into Tanglang River, and...
Embodiment 2
[0066] Embodiment 2: the pollution control method of eutrophic water body in the suburbs of the city, the specific content is as follows:
[0067] 1. Overview
[0068] Accounting for large and medium-sized cities: population of 500,000 to 1,000,000, per capita water quota of 200L / d. The water supply is 0.365-073.0 million cubic meters per year. Assuming that the amount of replenishment water is compared with the amount of water intake, the quality of replenishment water is divided into categories I, II, and III. The quality of polluted water used is category, with a water storage capacity of 300 million cubic meters and a water change cycle of 6 years.
[0069]2. The pollution control method of this eutrophic water body (influent water quality category IV), with a design scale of 100,000 m 3 / d (to meet the water consumption of 500,000 people), the specific operation is as follows:
[0070] (1) At normal temperature, the eutrophic water is input from the upper part of th...
Embodiment 3
[0088] Embodiment 3: the pollution control method of the eutrophic water body in the suburbs of the city, the specific contents are as follows:
[0089] 1. Overview
[0090] Calculated with a medium-sized city: the population is 500,000, and the per capita water quota is 200L / d. Assuming that the amount of replenishment water is compared with the amount of water intake, the quality of replenishment water is divided into categories I, II, and III. The quality of polluted water used is category, with a water storage capacity of 300 million cubic meters and a water change cycle of 6 years.
[0091] 2. The pollution control method of this eutrophic water body (influent water quality category IV), with a design scale of 100,000 m 3 / d (to meet the water consumption of 500,000 people), the specific operation is as follows
[0092] (1) At normal temperature, the Dianchi Lake water is input from the upper part of the biological filter evenly through the filter material layer, and...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com