Quick drying method for sludge
A silt and fast technology is applied in the field of promoting rapid dehydration and drying of dredged silt in rivers and lakes in the storage yard. The effect of reducing energy consumption and saving construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0064] Embodiment one: a kind of silt rapid drying method, take the following steps:
[0065] (1) Pre-buried drainage board. The sludge container is an iron box of 1m (length) × 1m (width) × 1m (height). Put a 1.2-long drainage board in the middle of the iron box with a hole diameter of 100 μm. In order to prevent it from floating or changing its position, fix its upper and lower ends, and pay attention to reserve 0.6m for the upper end.
[0066] (2) Pre-buried condenser pipe. Place a U-shaped copper tube in the middle of the iron box. The size of the copper tube is 16mm×1.5mm, the total length is 1.5m, and it is bent into a U shape.
[0067] (3) Embedded temperature sensor. Put 3 temperature sensors in the iron box to make them evenly distributed.
[0068] (4) Inject mud. Inject dredging mud into the iron box until the entire iron box is filled.
[0069] (5) Add 50ppm flocculant and 80ppm polyaluminum chloride coagulant to the iron box.
[0070] (6) Drain non-point so...
Embodiment 2
[0088] Embodiment two: a kind of silt rapid drying method, take the following steps:
[0089] (1) The experimental container is transformed from a container, and the internal dimensions are 5.7m (length) × 2.1m (width) × 2.2m (height).
[0090] (2) Pre-buried drainage board. Lay drainage boards at intervals of 70×70cm, and lay two rows in the container. The drainage boards are arranged in a triangle, each 2.5m long, and the hole diameter is 80μm. In order to prevent it from floating or changing its position, its lower end is fixed at the bottom of the container, its upper end is fixed at 0.4m from the top of the container, and 0.7m is reserved for the upper end.
[0091] (3) Install vacuum branch pipes and supervisors. Branch pipes and main pipes are made of hard plastic pipes with a diameter of 70mm. Connect the drainage board to the branch pipes through the joints, and connect all the branch pipes to the main pipe to form a pipe network system.
[0092](4) Pre-buried co...
Embodiment 3
[0114] Embodiment three: a kind of method that promotes the rapid drying of dredged silt in the stockyard, take the following steps:
[0115] (1) The sludge storage yard is a drying pond with an internal size of 15m (length) × 15m (width) × 4m (depth) and a volume of 900m 3 . The excavation is 2.5m below the ground, and the height of the cofferdam is 1.5m. Lay 2 layers of sealing film inside the drying tank for anti-seepage treatment.
[0116] (2) Pre-buried drainage board. Drainage boards are laid at intervals of 80×80cm, and the drainage boards are arranged in a triangle, each length is 4.5m, and the hole diameter is 90μm. In order to prevent it from floating or changing its position, its lower end is fixed on the bottom of the drying tank, and its upper end is fixed 1m away from the surface opening of the drying tank. Note that 1.5m should be reserved for the upper end.
[0117] (3) Install vacuum branch pipes and supervisors. Branch pipes and main pipes are made of ha...
PUM
| Property | Measurement | Unit |
|---|---|---|
| pore size | aaaaa | aaaaa |
| pore size | aaaaa | aaaaa |
| length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 