Unlock instant, AI-driven research and patent intelligence for your innovation.

Epoxy asphalt and preparation method thereof, as well as concrete containing same

An epoxy bitumen and bitumen technology, applied in building components, building insulation materials, buildings, etc., can solve problems such as segregation, and achieve the effects of simplified process, uniform and stable performance, and good compatibility.

Active Publication Date: 2015-07-01
北京碧海云智新材料技术有限公司
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0010] The present invention aims to provide an epoxy asphalt, its preparation method and its concrete, so as to solve the technical problem that the epoxy resin and asphalt mixture in the epoxy asphalt will segregate under the action of gravity field in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Epoxy asphalt and preparation method thereof, as well as concrete containing same
  • Epoxy asphalt and preparation method thereof, as well as concrete containing same
  • Epoxy asphalt and preparation method thereof, as well as concrete containing same

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0022] According to a typical implementation of the present invention, the epoxy asphalt includes A component and B component with a mass ratio of 1:4 to 6, wherein, A component includes the following components in parts by weight: 100 parts of epoxy resin , 0-20 parts of epoxy resin thinner; B component includes the following components in parts by weight: 400-500 parts of anhydride-modified asphalt, 10-50 parts of alicyclic acid anhydride, 50-100 parts of aliphatic dimer anhydride , 10-50 parts of polyether polyol, 0-5 parts of epoxy resin curing accelerator. Starting from the compatibility of epoxy asphalt, the present invention adopts aliphatic dimer anhydride as the main curing agent with good compatibility with asphalt. Since the aliphatic dimer anhydride has excellent curing toughness but insufficient strength, it is supplemented by aliphatic dimer anhydride. Anhydrides increase the strength of epoxy bitumen. The epoxy asphalt material prepared by adopting the technica...

Embodiment 1

[0030] Put 400 parts of anhydride-modified asphalt heated to 90-130°C into the reactor, and at the same time mix 35 parts of polyglutaric anhydride, 30 parts of polyazelaic anhydride, 35 parts of polyeicosane diacid anhydride, tetrahydrobenzene 5 parts of diformic anhydride, 5 parts of nadic anhydride, 10 parts of polytetrahydrofuran glycol, and 1 part of epoxy resin curing accelerator were stirred evenly until the viscosity of the system was uniform to prepare component B. Put 100 parts of E-51 epoxy resin heated to 60-70°C into a container, stir evenly and place until the system has uniform viscosity, transparent color and no bubbles, and then component A is prepared. Add component A to component B and stir evenly to obtain the epoxy asphalt material for steel box girder bridges. Mix stones, compact and keep warm for 5 hours to prepare epoxy asphalt concrete. The performance of the material itself and the performance of the prepared epoxy asphalt concrete are shown in Table...

Embodiment 2

[0032] Put 420 parts of anhydride-modified asphalt heated to 90-130 ° C into the reactor, and at the same time, 35 parts of polyglutaric anhydride, 20 parts of polyazelaic anhydride, 15 parts of polyeicosane diacid anhydride, polyisobutylene butanedi 15 parts of acid anhydride, 14 parts of nadic acid anhydride, 20 parts of polytetrahydrofuran glycol, 2 parts of epoxy resin curing accelerator and stir evenly until the viscosity of the system is uniform to prepare component B. Put 90 parts of E-51 epoxy resin heated to 60-70°C into a container, add 10 parts of epoxy reactive diluent, stir evenly and place until the system has uniform viscosity, transparent color and no bubbles, and then component A is prepared. Add component A to component B and stir evenly to obtain the epoxy asphalt material for steel box girder bridges. Mix stones, compact and keep warm for 5 hours to prepare epoxy asphalt concrete. The performance of the material itself and the performance of the prepared e...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
tensile strengthaaaaaaaaaa
densityaaaaaaaaaa
tensile strengthaaaaaaaaaa
Login to View More

Abstract

The invention discloses an epoxy asphalt, and a preparation method of the epoxy asphalt, as well as concrete containing the epoxy asphalt, wherein the epoxy asphalt comprises a component A and a component B with a mass ratio of 1:4-6, in which the component A comprises the following components in parts by weight: 80-100 parts of epoxy resin, and 0-20 parts of epoxy resin thinner; the component B comprises the following components in parts by weight: 400-500 parts of anhydride-modified asphalt, 10-50 parts of aliphatic anhydride, 50-100 parts of aliphatic anhydride dimer, 10-50 parts of polyether glycol and 0-5 parts of epoxy resin curing accelerator. The preparation method of the epoxy asphalt provided by the invention avoids using a special crushing and dispersing device and an expensive reactor for well dispersing each component, simplifies the process, and reduces the cost; and meanwhile the epoxy asphalt provided by the invention has good strength, toughness and fatigue resistance.

Description

technical field [0001] The invention relates to the technical field of asphalt preparation, in particular to an epoxy asphalt, a preparation method thereof and concrete comprising the same. Background technique [0002] Asphalt is widely used for paving roads due to its good mineral adhesion and viscoelasticity. Because it is a material with coexistence of viscosity and fluidity, when the temperature is high, it tends to flow; and when the temperature drops to a certain level, it shows strong resistance to flow. It is this characteristic that makes asphalt soft at high temperature, brittle at low temperature, and easy to age when heated, so that the traffic flow and load on the road increase, and asphalt pavement often has rutting in summer and cracks in winter. Therefore, it is necessary to modify asphalt to improve its performance to meet the needs of different occasions and environmental conditions. [0003] The existing regulations in my country give the definition of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): C08L95/00C08L63/02C08L71/00C04B26/26
Inventor 熊金平邸建军马玉然方坤李依璇刘小平
Owner 北京碧海云智新材料技术有限公司