A production process of 8011-o cable belt
A production process and cable technology, which is applied in the production process field of 8011-O cable belts, can solve the problems of high manufacturing cost, increased production cost, and prolonging the product manufacturing cycle, so as to reduce production cost, shorten the manufacturing cycle, and achieve good quality. The effect of emission reduction effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0027] The present invention can be explained in more detail by the following examples, and the purpose of disclosing the present invention is intended to protect all changes and improvements within the scope of the present invention, and the present invention is not limited to the following examples;
[0028] When implementing the 8011-O cable tape production process described in the present invention, the described process steps are as follows:
[0029] A. Melting: put the 8011 aluminum alloy material into the guide furnace for melting, the temperature of the guide furnace is 750±5°C, the hydrogen content is below 0.15ml / 100g Al, and the online degassing is carried out by the rotary blowing method. Stir fully and evenly after stage filtration, so that the aluminum liquid can be completely degassed and slag removed;
[0030] B. Casting: The molten aluminum after smelting is poured into two counter-rotating steel belts in equal amounts and at a uniform speed through a casting ...