Rapid construction method for truss with pneumatic membrane compression bar
A construction method and inflatable membrane technology, which are applied in the processing of building materials, construction, building structure, etc., can solve problems such as complex construction technology, achieve obvious economic benefits, shorten construction period, and reduce construction difficulty and risk.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0053] A kind of rapid construction method example that is applicable to the truss with inflatable film compression bar of the present invention sees Figure 1 to Figure 11 , follow the steps below:
[0054] A kind of rapid construction method applicable to the truss with inflatable film compression bar, the construction process is carried out according to the following steps:
[0055] S1: Fix the length of the prestressed cable 1 of the truss in the processing plant, and reserve an installation adjustment margin;
[0056] S2: Complete the layout of the truss support foundation and foundation at the construction site;
[0057] S3: Fill the air bag of the inflatable film pressure rod with an internal air pressure of 50KPa~70KPa;
[0058] S4: Assemble the two trusses, specifically follow the steps below:
[0059] Step S4.1: Place the two supports 2 to the initial installation position, the distance between the supports 2 is 4 / 5 of the length of the connecting rod 3; install t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com