Cable-stayed Concrete Pile Consolidation Device for Large Angle Steep Slope
A technology of concrete piles and cable-stayed piles, which is applied in excavation, construction, and infrastructure engineering, etc., can solve the problems of high cost and narrow space, and achieve the effects of small occupied area, high firmness, and good promotion and application value
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0013] Embodiment 1: as figure 1 As shown, in the construction of foundation pit 3 adjacent to the existing building 5, there is no or little grading space. At the edge of the foundation pit 3 set, the reaming hole is drilled outwards and downwards perpendicular to the edge line, and the reinforcement is arranged. Inject concrete to build the cable-stayed pile 2, remove the concrete of the cable-stayed pile 2 at the edge of the foundation pit 3, leave the inner steel bar of the cable-stayed pile 2 and bend it aside, drill the hole of the vertical pile 1, arrange the reinforcement, and place the cable-stayed pile 2. The steel bars are welded and bundled with the steel bars of the vertical pile 1, and the concrete is poured to form a whole.
Embodiment 2
[0014] Embodiment 2: as figure 2 , image 3 As shown, on a single-sided linear slope, on the platform formed in the process of excavating and repairing the slope, drill and drill 2 holes for cable-stayed piles perpendicular to the design slope surface, V-shaped bifurcation, place reinforcement and inject concrete, and excavate and repair the slope After the completion, the vertical pile 1 is built, and it is connected with the cable-stayed pile 2 and poured as a whole. When applied to roadside slope protection, there should be a gap between the road surface 7 drainage ditch 8 and the piles.