Construction method for precast energy pile
A construction method and energy pile technology, applied in sheet pile walls, refrigerators, refrigeration components, etc., can solve the problems of the overall bearing capacity of the pile foundation, and achieve the effects of simple construction technology, shortened construction period, and significant heat transfer effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] Specific embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings. The protection scope of the present invention is not limited only to the description of this embodiment.
[0039] Such as Figure 1-Figure 10 As shown, a prefabricated energy pile is composed of a prefabricated pile body 8 , a prefabricated pile can 9 and a prefabricated pile cap 11 . The outer surface of the prefabricated pile body 8 is polygonal, and the inner surface is polygonal or circular. The reinforcement cage in the prefabricated pile body 8 is composed of hollow steel pipes 3, solid steel bars 4 and stirrups 5. The heat transfer tubes 6 are arranged in the hollow steel pipes. 3; the heat transfer elbow 7 and the heat transfer pipe joint 10 are pre-embedded in the prefabricated spud can 9; the heat transfer elbow 7 and the heat transfer pipe joint are pre-embedded in the prefabricated pile cap 11 in the form of a W-shaped heat transfer...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com