Columns for jacking construction of long-span steel structure bridges
A column and span steel technology is applied to the field of columns for the jacking construction of large-span steel structure bridges, which can solve the problems of insufficient bearing capacity of the supporting structure, and achieve the effects of solving the insufficient bearing capacity of the supporting structure, convenient installation and construction, and not easy to damage.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] In the accompanying drawings, a column for jacking construction of a long-span steel structure bridge includes a column 1 and a column foundation 3, and the column 1 is composed of a column main body 1-1, a crosspiece 1-2, a scissor brace 1-3, and a column head. 1-4 and column feet 1-5, the column 1 includes four column main bodies 1-1, and crosspieces 1-2 are connected between the main column bodies 1-1; the crosspieces 1-2 are provided with Multiple, and evenly arranged along the length direction of the column main body 1-1; scissors braces 1-3 are connected between the upper and lower adjacent crosspieces 1-2; -1 connection, and the upper and lower adjacent two scissors braces 1-3 are arranged in the opposite direction; the top of the column main body 1-1 is connected to the column head 1-4, and the bottom end is connected to the column foot 1-5; the column 1 is formed by the column foot 1-5 is connected and fixed with column foundation 3.
[0020] The main body 1-1...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 