A technology of horizontal displacement and floor slab, applied in measurement devices, instruments, optical devices, etc., can solve problems affecting building quality and service life, changes in building internal force distribution, underground soil disturbance, etc., to overcome the influence of measurement results, The effect of satisfying the accuracy of the results and reducing the labor intensity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] Such as figure 2 , image 3 with Figure 4 The shown method for monitoring horizontal displacement of multi-layer floor slabs includes the following steps:
[0024] ① Deploy at least three observing piers for forced alignment of horizontal displacement control outside the construction-affected area, and obtain the absolute coordinates of each observation pier through GPS static measurement or precision traverse measurement;
[0025] ②Install mandatory centering devices on the monitoring points with a certain interval on the first floor;
[0026] ③Drill holes with diameter D in the same vertical position as the center of the forced centering device on each floor to be tested;
[0027] ④Adjust the position of each digital display light target so that its outer contour is parallel to the building axis, and then use the L-shaped angle steel frame to fix each digital display light target to the hole drilled in each floor to be tested;
[0028] ⑤Set up a total station on the observin...