Deep and shallow dock assembly and assembly line operation method for producing and shipping large prefabricated components
A technology of prefabricated components and assemblies, used in industrial buildings, water conservancy projects, underwater structures, etc., can solve problems such as difficulty in meeting requirements, increasing pressure on construction schedules, and difficulty in on-site command and operation, saving construction time. , the effect of ensuring safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] see figure 1 , figure 2 As shown, a kind of deep and shallow dock assembly of the present invention that produces large-scale prefabricated components, this deep and shallow dock assembly includes enclosure 1 for preventing seawater from entering, and is provided with for large-scale prefabricated components 12 first The shallow docking area 2 for secondary outfitting and floating and the deep docking area 3 for secondary outfitting and shipping; one end of the fence is provided with a shallow docking door 4 for opening and closing the shallow docking area. The other end of the fence is provided with a deep dock door 5 for opening and closing the deep dock area and realizing drainage of the deep and shallow dock combination. The enclosure described in this embodiment completely surrounds the shallow dock area and the deep dock area. On the end of the enclosure opposite to the prefabrication workshop 6, there is a gate for the entry of large prefabricated components. T...
Embodiment 2
[0045] see image 3 , Figure 4 As shown, the outfitting yard in this embodiment is an improvement on the basis of Embodiment 1. The technical content disclosed in Embodiment 1 will not be described repeatedly, and the content disclosed in Embodiment 1 also belongs to the content disclosed in this embodiment.
[0046] In this embodiment, the shallow docking area 101 and the deep docking area 102 are arranged side by side; the level of the bottom surface of the shallow docking area is higher than the level of the bottom surface of the deep docking area.
[0047] In this embodiment, a transition slope 103 is also provided at the connection between the shallow docking area and the deep docking area.
[0048] The enclosure in this embodiment includes two end retaining walls 104 and side retaining walls 105 arranged on the upper and lower sides of the two end retaining walls. In this embodiment, the upper end surfaces of the side retaining wall and the end retaining wall are on t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com