Underground gas storage completion pipe string internal pressure fatigue test device and test method
A completion pipe string and fatigue test technology, which can be used to test the strength of materials by applying repetitive force/pulsation force, by measuring the increase and deceleration rate of fluid, and by using liquid/vacuum degree for liquid tightness measurement, etc., which can solve natural gas leakage and other issues to achieve the effect of ensuring production safety, optimizing operating parameters, and ensuring safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] see figure 1 , figure 2 , image 3 As shown, the embodiment of the present invention provides an underground gas storage well completion pipe string internal pressure fatigue test device, which is used to simulate the strength and tightness of the gas storage completion pipe string under the reciprocating radial pressure of injection and production. Obtain the structural performance and sealing performance of the underground gas storage completion string (including tubing string and casing string) under the reciprocating change of injection and production pressure, and obtain pressure change data such as sealing performance and fatigue strength under the internal pressure of the string, Realize the life management and reliability control of parts and components, and ensure the sealing integrity of the completion string; the device mainly includes: pressure transmission mechanism A, closed cavity mechanism B, control system C, leak detection system D and the string Sa...
Embodiment 2
[0058] The embodiment of the present invention provides an underground gas storage well completion pipe string internal pressure fatigue test method, mainly for simulating the structural strength and sealing integrity detection system method of the gas storage string under the reciprocating pressure changes of injection and production , obtaining the fatigue limit of failure under multiple alternating injection-production pressures in the completion pipe string, obtaining radial pressure change data such as sealing performance and fatigue strength, and guiding the injection-production operation of the gas storage and the selection of pipe string materials; the method includes: 1) Preparation of completion string for test, 2) Adjustment of pressure plate of pressure transmission mechanism, 3) Packaging of string sample, 4) Test and other main process steps, among which:
[0059] 1) Preparation of completion string for test
[0060] Step 1. Before the test, take necessary safety...
PUM
Property | Measurement | Unit |
---|---|---|
length | aaaaa | aaaaa |
length | aaaaa | aaaaa |
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com