Corbel bracket platform for simultaneous construction of bridge piers and transverse beams and its construction method

A technology of synchronous construction and transverse tie beams, which is applied in bridge construction, bridge erection/assembly of bridges, etc., can solve the problems of long construction period, slow construction speed, and inability to realize simultaneous construction of transverse tie beams and pier columns, etc. Safe and controllable, less material effect

A technology of synchronous construction and transverse tie beams, which is applied in bridge construction, bridge erection/assembly of bridges, etc., can solve the problems of long construction period, slow construction speed, and inability to realize simultaneous construction of transverse tie beams and pier columns, etc. Safe and controllable, less material effect

CN103882813BActive Publication Date: 2016-02-03CHINA RAILWAY ERJU 1ST ENG +1

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Corbel bracket platform for simultaneous construction of bridge piers and transverse beams and its construction method
  • Corbel bracket platform for simultaneous construction of bridge piers and transverse beams and its construction method
  • Corbel bracket platform for simultaneous construction of bridge piers and transverse beams and its construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0035] The corbel bracket platform for synchronous construction of bridge piers and transverse beams according to the present invention includes a pier column model, a corbel, and a transverse beam bracket platform, and each section of the pier column model is composed of two semicircular steel It is assembled from the front and back of the mould, and the horizontal tie beam bracket platform includes jacks, I-beams, tie rods, and distribution beams. The schematic diagram of its structure is as follows: figure 1 Shown: Corbels 2 are respectively welded at the same height in the middle of the semicircular steel molds on both sides of the pier model 1, the jack 3 is installed on the corbel 2, and the I-beam 4 is placed on the jack 3 along the horizontal direction. The I-beams 4 on both sides of the pier model 1 are connected together by tie rods 5 and fastened to the pier model 1, and the distribution beams 6 are placed between the I-beams 4 at equal intervals.

[0036] Among the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a corbel bracket platform for bridge pier and transverse straining beam synchronous construction. The corbel bracket platform is characterized in that the positions, with the equal height, in the middle of semicircular steel molds on the two sides of the upper portion of a pier column model (1) are respectively provided with a corbel (2) in a welding mode, jacks (3) are installed on the corbels (2), I-beams (4) are placed on the jacks (3) in the horizontal direction, the I-beams (4) on the two sides of the pier column model (1) are connected together through pulling rods (5) and fastened on the pier column model (1), and distributive beams (6) are placed between the I-beams (4) at equal intervals. The invention further discloses a construction method of the corbel bracket platform. According to the corbel bracket platform, synchronous construction of a pier column and a transverse straining beam is achieved, the construction cycle period of components below a bridge is shortened, and the bridge construction progress is accelerated. Meanwhile, compared with a traditional construction scheme, the input material cost is low, materials of the platform of the transverse training beam can be completely recycled for coping beam construction, and the circulating utilization rate of the materials is high.

Description

technical field [0001] The invention relates to a construction bracket platform suitable for bridge piers designed with transverse tie beams, in particular to a novel corbel bracket platform for synchronous construction of bridge piers and transverse tie beams and a construction method thereof. Background technique [0002] When designing high bridge piers, it is necessary to set transverse beams between the two pier columns to increase the lateral stiffness of the pier body and prevent the lateral instability of the pier body. The traditional methods for erecting the construction platform of high pier transverse tie beams include bracket method, steel rod method and hoop method. [0003] The traditional method has the following disadvantages: (1) The traditional method of the transverse tie beam needs to complete the construction of the pier column first, set up the bracket between the two pier columns, put steel rods on the pier columns or install hoops, and then build the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
03 Feb 2016
Publication
CN103882813B
IPC
E01D21/00
Inventors
何寿海; 刘汉龙