Concrete box shield tunneling and receiving construction method
A construction method and concrete technology, which is applied in earth drilling, mining equipment, tunnels, etc., can solve the problems of risk control uncertainty, low construction efficiency, etc., to prevent soil subsidence, maintain soil pressure balance, and facilitate recharging Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0053] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0054] see first figure 1 and figure 2 As shown, the construction method of the concrete box shield tunneling reception of the present invention mainly adopts the closed concrete box 11 mode to implement the shield tunneling reception, and constructs a concrete box 11 in the receiving shaft 21, and cooperates with image 3 As shown, the concrete box 11 is filled with foamed lightweight concrete 12, and the foamed lightweight concrete 12 reaches a compressive strength ≥ 1 MPa after pouring and curing for 3 days, which meets the cutting and bearing capacity requirements of the shield machine, and the backfilling operation is carried out after the door 13 is broken. . recombine Figure 4~6 As shown, after the strength index of the foam lightweight concrete 12 meets the design requirements, the shield tunneling 14 receiving operation ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com