Rapid construction method of gate and dam engineering
A construction method and engineering technology, applied in marine engineering, water conservancy engineering, hydroelectric power station, etc., can solve problems such as complex construction technology of concrete, ensure stability and operability, facilitate door slot installation, realize automatic installation and effect of adjustment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Example 1: The diversion project of the hydropower station has 2 gates and needs to install gate slots, that is, install 4 gate slots. The construction method is as follows figure 1 As shown, after the bottom surface of the gate dam and the bottom sill of the gate sill are poured and formed, according to the predetermined position according to the design and measurement, the door sills are hoisted and installed on the bottom sill of the gate. Climbing gear units such as figure 2 As shown, the door slot installation climbing device includes a vertical truss 1, a door slot part installation part is provided on the outside of the truss, a door slot part storage part is provided on the inside of the truss, and a manipulator is also installed on the truss 3. The manipulator 3 can grab and release the door slot parts, and move between the door slot part installation part and the door slot part storage part; anchor cables and connecting rods are installed between adjacent doo...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 