Support structure system and construction method of large cross-section deep shaft in rocky strata
A support structure and large-section technology, applied in shaft equipment, earthwork drilling, shaft lining, etc., can solve the difficulty of effective control of shaft side wall stability and deformation, the impact of project investment and construction progress, and large safety risks, etc. problems, to achieve the effects of controlling deformation and surface settlement, enhancing overall stability, and saving engineering investment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0024] The present invention will be described in detail below in combination with specific embodiments.
[0025] The large-section deep shaft in the rocky strata involved in the present invention has an excavation size of (17.3x11.3) m and an excavation area of 195.5 m 2 , with an excavation depth of 39.6m; with such a large excavation section and excavation depth, whether to consider the support type according to the general shaft or to implement the enclosure structure according to the deep foundation pit is a difficult problem in front of the design; Generally, the most commonly used support method for shafts in rock formations is steel frame bolting and shotcreting support, but for shafts with large cross-sections, if only steel frame bolting and shotcreting support is used, the stability and deformation of the side walls of the shaft will be greatly affected. Effective control is more difficult, and the safety risk is greater; if the deep foundation pit is considered, ...
PUM