Top-down construction method for anchor rod and rotary jet grouting back cover deep foundation pit without precipitation operation

A construction method and technology without precipitation, which can be applied in foundation structure engineering, excavation, sheet pile walls, etc., can solve problems such as wasting groundwater resources, changing the mechanical properties of rock and soil layers, and failure of foundation pit support structure design, etc., and achieves wide application , wide applicability, and the effect of protecting groundwater resources

Active Publication Date: 2014-08-20
中冶沈勘工程技术有限公司
View PDF5 Cites 20 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The dewatering construction of deep foundation pits not only changes the distribution of groundwater and seriously wastes groundwater resources, but also changes the mechanical properties of the original rock and soil layers, resulting in design failure of foundation pit support structures and deformation or even destruction of surrounding structures.
In order to protect the groundwater resources and the mechanical properties of the original rock and soil layers, the existing construction methods cannot meet the requirements of energy conservation and environmental protection.
[0003] At present, the deep foundation pit dewatering operation is a necessary procedure for foundation pit excavation in the existing construction methods. The dewatering operation will lead to the exploitation of a large amount of groundwater, which will change the distribution law of groundwater and the mechanical properties of the original rock and soil layer. Serious accidents such as bottom sand gushing and foundation pit instability
The existing deep foundation pit construction methods are difficult to achieve in terms of protecting groundwater resources and not changing the mechanical properties of the original rock and soil layers.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Top-down construction method for anchor rod and rotary jet grouting back cover deep foundation pit without precipitation operation
  • Top-down construction method for anchor rod and rotary jet grouting back cover deep foundation pit without precipitation operation
  • Top-down construction method for anchor rod and rotary jet grouting back cover deep foundation pit without precipitation operation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] Such as Figure 1 to Figure 5 As shown, the bottom-sealing construction method of deep foundation pit without precipitation operation includes the construction of high-pressure jet-grouting pile water-stop curtain on the side wall of the foundation pit, the bottom-sealing of jet-grouting pile, the construction of anti-floating anchor bolt and the excavation of foundation pit.

[0040] Illustrate construction process of the present invention below in conjunction with accompanying drawing:

[0041] The upside-down construction method of a deep foundation pit sealed by rotary grouting of bolts without precipitation is applied to the construction of a certain deep foundation pit, and some data are shown in Table 1 and Table 2.

[0042] The groundwater elevation of the project is -8.5 meters, the foundation pit area is 211.14 square meters, the circumference is about 56m, and the depth is 21.5m; 24m long. The side wall of the foundation pit adopts high-pressure rotary grou...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of civil engineering and particularly relates to a top-down construction method for an anchor rod and rotary jet grouting back cover deep foundation pit without precipitation operation. The top-down construction method for the anchor rod and rotary jet grouting back cover deep foundation pit without precipitation operation particularly comprises the steps of construction preparation, construction of a water stop curtain of a high-pressure rotary jet grouting pile of the side wall of the foundation pit, construction of a rotary jet grouting pile back cover, construction of an anti-floating anchor rod, and excavation of the foundation pit. The water stop curtain of the high-pressure rotary jet grouting pile of the side wall of the foundation pit is connected with the jet grouting pile back cover, and the anti-floating anchor rod is connected with the rotary jet grouting pile back cover of the anchor rod. According to the top-down construction method, it can be ensured that a side wall support is closely connected with the rotary jet grouting pile back cover while the requirements for strength, stability and impermeability from construction of the water stop curtain of the high-pressure rotary jet grouting pile of the side wall of the foundation pit, the jet grouting pile back cover and the anti-floating anchor rod are met, the external anchorage section of the anti-floating anchor rod is located in the rotary jet grouting pile back cover, an effective water stop system can be formed in the deep foundation pit, and influence on construction from the underground water level does not need to be controlled.

Description

technical field [0001] The invention belongs to the technical field of civil engineering, and in particular relates to an upside-down construction method for a bottom-sealing deep foundation pit by rotary grouting of bolts without precipitation. Background technique [0002] With the construction of large-scale transportation water conservancy projects, industrial buildings, high-rise and super high-rise buildings and urban underground projects, there will be a large number of deep foundation pits and ultra-deep foundation pit projects, and their safety will directly affect the surrounding buildings, pipe network and construction. safety. The dewatering construction of deep foundation pits not only changes the distribution of groundwater and seriously wastes groundwater resources, but also changes the mechanical properties of the original rock and soil layers, resulting in design failure of foundation pit support structures and deformation or even destruction of surrounding ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/02E02D17/04E02D5/74E02D19/18
Inventor 张建国王家伟董天文于卉聂振刚于梅哲金佳旭谢鲁齐
Owner 中冶沈勘工程技术有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products