Setting method and structure of horizontal structural joints in concrete slab of rockfill dam
A technology of concrete panels and horizontal structural joints, applied in dams, barrages, water conservancy projects, etc., can solve problems such as panel deformation and damage, prevent cracking and extrusion damage, improve reliability, and solve deformation damage and leakage problems. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
[0017] The present invention is implemented like this: see first figure 1 , this type of dam is that a concrete panel 1 is provided on the upstream face of the dam body 7 of the rockfill structure, and when the concrete panel 1 is poured, the panel is divided into several pieces from bottom to top, the lower part is connected to the plinth 6, the upper part reaches the dam crest, and the lower part Part of the concrete face plate 1 and plinth 6 is covered by bedding 5 . A horizontal arc-shaped seam 2 is set at the block of the adjacent concrete panel 1. The horizontal arc-shaped seam 2 is an arc-shaped structure. Near both sides, the joint faces separate adjacent concrete panels 1 .
[0018] Look figure 2 , the bottom surface and the top surface of the horizontal arc-shaped seam 2 are respectively provided with a copper sheet water stop 3 ...
PUM
Login to View More Abstract