Method for regulating pebble shoal in intensified low-flow branching layout
A pattern and moisture technology, which is applied in the field of pebble shoal remediation to strengthen the pattern of dry water distribution, can solve the problems of poor stability of trenches, difficulty in increasing the bending radius, and large amount of waterway maintenance works, so as to enhance the overall stability and improve the dam body. Good stability and the effect of strengthening river characteristics
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0013] The present invention is realized in such a way that dredging and dam-building are adopted to combine dredging and dam-building measures to open up a straight trough for navigating dry-water branch pebble shoals in the transitional section; building parallel dams and tooth dams on low mid-shoals to strengthen the pattern of dry-water branch , to promote the return of water flow to the channel and properly narrow the straight channel, which is conducive to the stability of the navigation channel; at the head of the shunt dam and the head of the tooth dam in the center of the river where the wa...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 