One-time well-forming method of pre-control top subdivision mine
A technology of pre-control top and section, which is applied in blasting and other directions, can solve the problems of insufficient compensation space and free surface of blasting operation, etc., and achieve the effects of large compensation space, improved blasting efficiency and reduced production cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] Embodiments of the present invention are further described below in conjunction with accompanying drawings:
[0017] The one-time well-forming method of pre-controlled top subdivision mine of the present invention mainly adopts the blasting scheme with parallel deep holes as the free surface. The parallel deep holes include empty holes and charge holes, and the charge holes include four cuts ①-④ hole, ⑤—⑧ four auxiliary holes and ⑨— Four peripheral holes, ①—④ are charged in sections at intervals, ⑤— Columnar continuous charge is adopted, and the arrangement and connection of each hole is as follows: figure 1 As shown, the details are as follows:
[0018] The hole diameter D is 300mm, the charge hole diameter d is 100mm, and the ore fragmentation coefficient K is 1.8. a is rounded to an integer value of 687mm, ⑨— The peripheral holes are also uniformly distributed on the periphery of the empty holes in sequence, the distance between two adjacent peripheral hole...