A deep foundation pit cross construction method for subway transfer stations

A cross-construction and deep foundation pit technology, which is applied in the direction of infrastructure engineering, excavation, underwater structures, etc., can solve the problems of increasing the construction period and construction cost of the project, and achieve the effects of shortening the construction time, preventing deformation, and strengthening the connection

Active Publication Date: 2016-05-18
CHINA CONSTR SIXTH ENG DIV CORP
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, the construction of urban rail transit transfer stations, reserved transfer nodes, and adjacent deep foundation pits of other projects interferes with each other. Taking transfer stations as an example, the transfer nodes are generally constructed first, and the standard construction on both sides of the transfer nodes The back pressure soil is reserved in the section, and the earthwork, temporary support and main structure construction of the standard stations on both sides of the transfer node can only be carried out after the earthwork, temporary support and main structure of the transfer node are completed, which greatly increases the construction period and construction cost of the project , cannot be accepted by the construction unit

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A deep foundation pit cross construction method for subway transfer stations

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] In order to further understand the invention content, characteristics and effects of the present invention, the following examples are given, and detailed descriptions are as follows in conjunction with the accompanying drawings:

[0019] see figure 1 , a subway transfer station deep foundation pit cross construction method, the deep foundation pit includes adjacent node section foundation pits 1 and standard section foundation pits 2, in this embodiment, there are two standard section foundation pits 2, The two standard section foundation pits 2 are located on both sides of the node section foundation pit 1.

[0020] The above-mentioned subway transfer station deep foundation pit cross construction method is carried out according to the following steps:

[0021] 1) Carry out finite element structural analysis and calculation on the foundation pit enclosure structure of the node section, and determine the weak position of the foundation pit enclosure structure of the n...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a cross construction method for deep foundation pits in a metro interchange station. The method comprises the following steps: completing the construction from a node-section foundation pit to a first inner support; completing the construction from standard-section foundation pits to the first inner support; and conducting cross construction of the node-section foundation pit and the standard-section foundation pits until the designed elevation is reached. In the construction process of the standard-section foundation pits, when standard-section foundation pit earth is excavated to the depth corresponding to the week position of a node-section foundation pit support structure, the construction of external supports and external gusset plates of the node-section foundation pit support structure is completed in the standard-section foundation pits first, and then standard-section foundation pit earth is excavated. According to the method provided by the invention, the cross construction of the node-section foundation pit and the standard-section foundation pits is realized by adopting the method that the external supports and the external gusset plates of the node-section foundation pit support structure are constructed in sequence in the standard-section foundation pits, and the construction time and the construction cost are shortened greatly.

Description

technical field [0001] The invention relates to a construction method of foundation pits, in particular to a cross construction method of adjacent deep foundation pits. Background technique [0002] At present, the construction of urban rail transit transfer stations, reserved transfer nodes, and adjacent deep foundation pits of other projects interferes with each other. Taking transfer stations as an example, the transfer nodes are generally constructed first, and the standard construction on both sides of the transfer nodes The back pressure soil is reserved in the section, and the earthwork, temporary support and main structure construction of the standard stations on both sides of the transfer node can only be carried out after the earthwork, temporary support and main structure of the transfer node are completed, which greatly increases the construction period and construction cost of the project , cannot be accepted by the construction unit. Contents of the invention...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D17/02E02D17/04
CPCE02D17/02E02D17/04E02D29/04
Inventor 柴艳飞任富芝安文河徐利
Owner CHINA CONSTR SIXTH ENG DIV CORP
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More