A method for assembling U and V rib embedding sections of bridge decks with high and large cross-sections

An assembly method and a technology of embedded segments, which are applied in the field of bridge steel structures, can solve problems such as reducing the service life of bridges and affecting the fatigue resistance of bridge decks, and achieve the effects of improving work efficiency, simple structure, and simple operation

Active Publication Date: 2016-08-24
STEEL STRUCTURE CONSTR CO LTD OF CHINA TIESUU CIVIL ENG GRP
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] During the erection of the bridge position and the welding construction of the ring joints, the construction unit often uses the method of manual lifting when assembling the U and V rib embedding sections of the high and large cross-section steel box girder bridge deck, and the U and V rib embedding of the bridge deck The assembly quality of the section cannot meet the quality requirements of the U and V ribs of the orthotropic bridge deck, which will directly affect the fatigue resistance of the bridge deck and greatly reduce the service life of the entire bridge

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method for assembling U and V rib embedding sections of bridge decks with high and large cross-sections
  • A method for assembling U and V rib embedding sections of bridge decks with high and large cross-sections
  • A method for assembling U and V rib embedding sections of bridge decks with high and large cross-sections

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] Referring to the accompanying drawings, a method for assembling U and V rib embedding sections of a bridge deck with a high and large cross-section, U-shaped brackets are designed according to the external dimensions of U and V ribs, and opening bolts are arranged on both sides of the bracket to adjust the opening size of the bracket. And use the vertical rod steel pipe to cooperate with the screw rod to lift the bracket. After the jack is lifted to the position of the embedded section, the bolts at the opening of the bracket are adjusted for precise adjustment. The leveling base and the vertical rod steel pipe pass through a fixed shaft and an adjustment shaft. It is connected with each other, and it is suitable for operation on any angle of inclined floor. When adjusting the angle of the vertical rod steel pipe, turn the vertical rod steel pipe with the fixed shaft as the axis. When it is adjusted to the operable angle, tighten the adjustment shaft, and click Welding f...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a high and large section bridge deck slab U and V rib joining section assembling method. A tool comprises a bracket where a U and V rib jointing section is placed, opening adjusting bolts, a lead screw jacking system, a vertical rod, a leveling base and other elements. During working, U and V ribs are placed on the bracket, a jacking system nut is rotated to enable the bracket to slowly ascend to the jointing assembly position, then the opening adjusting nuts are utilized for accurately adjusting the jointing section position, spot welding and fixing are carried out after accurate positioning, and the next working procedure is carried out; the leveling base and the vertical rod are connected in an angle-adjustable mode, so that assembly of U and V rib jointing sections at different angle inclined bottom plate positions inside a box body is achieved. The tool is simple in structure, the operation method is simple and fast, the jointing section assembling precision is effectively controlled, and the whole bridge deck slab U and V rib overall straightness is improved, so that the bridge deck slab anti-fatigue performance is improved, and the working efficiency is greatly improved.

Description

technical field [0001] The invention relates to a method for assembling the U and V rib embedding sections of a bridge deck with a high and large cross-section, which is mainly used for precise in-position adjustment during the assembly process of the U and V rib embedding sections of the steel box girder bridge deck unit, and belongs to bridge steel structure technology field. Background technique [0002] According to the analysis of many actual cases in China, under the influence of continuous dynamic load effect and fatigue damage of steel box structure bridges, cracks occur at the U and V ribs of the bridge deck, which affects the service life of the entire bridge. At present, the steel box structure bridge industry is also jointly exploring a breakthrough to overcome this difficulty. [0003] During the erection of the bridge position and the welding construction of the ring joints, the construction unit often uses the method of manual lifting when assembling the U an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00E01D19/12
CPCE01D19/125E01D21/00
Inventor 李国华方继金健牙马忠董燕囡杨惠丰李荣浩杨兴武
Owner STEEL STRUCTURE CONSTR CO LTD OF CHINA TIESUU CIVIL ENG GRP