Treatment technology for waste water produced in recovering rare earth waste materials
A technology of rare earth waste and treatment process, which is applied in the directions of water/sewage multi-stage treatment, light water/sewage treatment, water/sludge/sewage treatment, etc. It can solve the problems of environmental damage and inefficient treatment of waste water, etc., to achieve Effects of improving processing efficiency and reducing processing costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] A treatment process for rare earth waste recovery wastewater, wherein the rare earth waste recovery wastewater includes extraction workshop wastewater, washing wastewater, and flushing wastewater, and the extraction workshop wastewater, washing wastewater, and flushing wastewater are classified for treatment;
[0020] The wastewater from the extraction workshop is pretreated sequentially through oil separation, lime neutralization, and sulfide precipitation; the pH value of the extraction workshop wastewater after neutralization with lime is 6.8-7.8. In the sulfidation and precipitation treatment of wastewater in the extraction workshop, slowly add Na 2 S·9H 2 O, the amount of medicament added is 5 times of the required theoretical amount in the heavy metal reaction process, and after adding Na 2 S·9H 2 O while stirring, the reaction time of the stirring was 3.0 h.
[0021] The washing wastewater is subjected to neutralization adjustment pretreatment; the pH value of...
Embodiment 2
[0028] A treatment process for rare earth waste recovery wastewater, wherein the rare earth waste recovery wastewater includes extraction workshop wastewater, washing wastewater, and flushing wastewater, and the extraction workshop wastewater, washing wastewater, and flushing wastewater are classified for treatment;
[0029] The wastewater from the extraction workshop is pretreated sequentially through oil separation, lime neutralization, and sulfide precipitation; the pH value of the extraction workshop wastewater after neutralization with lime is 6.8-7.8. In the sulfidation and precipitation treatment of wastewater in the extraction workshop, slowly add Na 2 S·9H 2 O, the amount of medicament added is 2.5 times of the required theoretical amount in the heavy metal reaction process, and after adding Na 2 S·9H 2 O while stirring, the reaction time of the stirring is 1.0h.
[0030] The washing wastewater is subjected to neutralization adjustment pretreatment; the pH value of...
Embodiment 3
[0037] A treatment process for rare earth waste recovery wastewater, wherein the rare earth waste recovery wastewater includes extraction workshop wastewater, washing wastewater, and flushing wastewater, and the extraction workshop wastewater, washing wastewater, and flushing wastewater are classified for treatment;
[0038] The wastewater from the extraction workshop is pretreated sequentially through oil separation, lime neutralization, and sulfide precipitation; the pH value of the extraction workshop wastewater after neutralization with lime is 6.8-7.8. In the sulfidation and precipitation treatment of wastewater in the extraction workshop, slowly add Na 2 S·9H 2 O, the addition of the medicament is 4 times of the required theoretical amount in the heavy metal reaction process, and after adding Na 2 S·9H 2 O while stirring, the reaction time of the stirring is 2 h.
[0039] The washing wastewater is subjected to neutralization adjustment pretreatment; the pH value of th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More