Deep cover layer pipe drilling method

A technology of deep overburden and pipe drilling, which is applied to drilling equipment and methods, drill pipes, drill pipes, etc., can solve the problems of slow drilling, drill sticking, and drilling bending, etc. Construction cost, effect of ensuring verticality

Active Publication Date: 2015-08-12
SINOHYDRO FOUND ENG
View PDF7 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Drilling, as one of the important processes, is closely related to the progress, quality and construction cost of the project. At present, in order to solve the problems of slow drilling and hole wall collapse, the overburden foundation mostly adopts the tunnel drilling process, but for the deep overburden foundation Generally speaking, the use of traditional follow-up pipe drilling technology often causes follow-up pipe breakage accidents, mainly in the following categories: 1. During the drilling construction process, with the increase of drilling depth, the friction force of the pipe wall increases, and the follow-up pipe The load will increase accordingly. When drilling into the overburden pebble foundation, the drill will be stuck if you are not careful. If you do not deal with it in time and continue drilling, the follower pipe may break; The connecting part of the pipe and the heel pipe is connected by a screw, which is the weak part of the whole heel pipe. Long-term repeated use causes certain quality defects in this part, and a large pull-out force may easily cause the heel pipe to break; 3. During drilling construction During the process, the verticality of the drilling hole was not well controlled, and deviation occurred, and the deviation correction measures were not taken in time, resulting in the bending of the drilling hole and the fracture of the follower pipe

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Deep cover layer pipe drilling method
  • Deep cover layer pipe drilling method
  • Deep cover layer pipe drilling method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The present invention provides a controllable grouting method for deep overburden with valve-casing pipe method, comprising the following steps: installing drilling equipment, realizing one-time drilling of follow-up pipes to form boreholes, and using follow-up pipes that are simultaneously lowered into the drill holes to form working holes ;Install the sleeve valve pipe assembly in the operation hole; pour casing slurry into the annular gap between the sleeve valve pipe assembly and the heel pipe until the casing slurry overflows from the orifice, so as to fix the sleeve valve pipe assembly on the In the middle of the operation hole; after the casing slurry is poured, the heel pipe is taken out from the borehole so that the casing slurry is in contact with the formation; before the casing slurry is completely condensed, the grouting plug is separated The section is jammed into the casing valve pipe assembly, and the grouting slurry is poured laterally into the formation...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Hole depthaaaaaaaaaa
Apertureaaaaaaaaaa
Login to View More

Abstract

The invention discloses a deep cover layer pipe drilling method comprising the following steps: drill hole formation through one-time pipe drilling is performed by at least two types of drilling tools, an operation hole encircled by lowered pipes is formed, and deep cover layer grouting is performed through the operation hole, wherein pipes of at least two materials are lowered in the period of drill hole formation through one-time pipe drilling by at least two types of drilling tools. Drill hole formation through one-time pipe drilling is realized, repeated drilling is avoided, the efficiency of construction is improved greatly, the occurrence of hole fault is avoided effectively, the occurrence of pipe breakage is reduced effectively, the construction cost is lowered, and smooth completion of a project is ensured.

Description

technical field [0001] The invention relates to the field of flow stages, in particular to a deep covering layer and pipe drilling method. Background technique [0002] Overburden foundation treatment is usually carried out by drilling and grouting, which is widely used in water conservancy and hydropower projects, urban rail transit projects, municipal public utilities and other projects. Drilling, as one of the important processes, is closely related to the progress, quality and construction cost of the project. At present, in order to solve the problems of slow drilling and hole wall collapse, the overburden foundation mostly adopts the tunnel drilling process, but for the deep overburden foundation Generally speaking, the use of traditional follow-up pipe drilling technology often causes follow-up pipe breakage accidents, mainly in the following categories: 1. During the drilling construction process, with the increase of drilling depth, the friction force of the pipe wa...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21B7/00
CPCE21B7/00E21B7/04E21B17/00E21B19/02E21B33/13E21B34/06
Inventor 李文书袁冲肖恩尚苏迎春罗斌陈浩鹏李杨
Owner SINOHYDRO FOUND ENG