A high-tower compound fertilizer granulation tower top tail gas purification equipment
A technology for high tower compound fertilizer and exhaust gas purification
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0058] Embodiment 1: Tail gas purification equipment at the top of the high-tower compound fertilizer granulation tower of the present invention
[0059] The structure of the prilling tower top tail gas purification equipment is as follows: in the prilling tower body 1, a prilling tower equipment inner cylinder 3 is arranged on the top of the prilling tower body 1, and its diameter is the diameter of the prilling tower body 1 65% of the diameter, and an axial flow induced draft fan 8 is set on the top of the prilling tower body 1, its rotating speed is 140 rpm, and the diameter of its fan blade is 40% of the diameter of the prilling tower body 1;
[0060] Set the water collection bucket 5 on the top of the inner cylinder 3 of the prilling tower equipment, which is a groove with an inverted truncated cone structure, and the bottom diameter of the water collection bucket 5 is 75% of the diameter of the inner cylinder 3 of the prilling tower equipment; The angle between the side ...
Embodiment 2
[0066] Embodiment 2: Tail gas purification equipment at the top of the high-tower compound fertilizer granulation tower of the present invention
[0067] The structure of the high-tower composite fertilizer granulation tower top tail gas purification equipment of this embodiment is the same as that of Embodiment 1, except that the diameter of the inner cylinder 3 of the granulation tower equipment is 60% of the diameter of the granulation tower tower body 1, and the axial flow induced draft fan The rotating speed of 8 is 30 rev / min, and the diameter of its fan blade is 65% of the diameter of the prilling tower body 1; The angle between the side of the truncated cone and the horizontal line is 40°; the height of the packing section 6 is 10% of the diameter of the prilling tower body 1; its diameter is the same as that of the prilling tower body 1; the inner diameter of the water retaining ring It is 60% of the diameter of the prilling tower body 1; the area of the prilling to...
Embodiment 3
[0069] Embodiment 3: Tail gas purification equipment at the top of the high-tower compound fertilizer granulation tower of the present invention
[0070] The structure of the high-tower composite fertilizer granulation tower top tail gas purification equipment of this embodiment is the same as that of embodiment 1, except that the diameter of the inner tube 3 of the granulation tower equipment is 75% of the diameter of the granulation tower tower body 1, and the axial flow induced draft fan The rotating speed of 8 is 200 rev / min, and the diameter of its fan blade is 25% of the diameter of the prilling tower body 1; The angle between the side of the truncated cone and the horizontal line is 24°; the height of the packing section 6 is 20% of the diameter of the prilling tower body 1; its diameter is the same as that of the prilling tower body 1; the inner diameter of the water retaining ring It is 70% of the diameter of the prilling tower tower body 1; the area of the prilling...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
