[0032] 100 tons of converter double slag smelting, furnace input conditions: molten iron C4.23%, Si0.76%, P0.133%, Ti0.018%, molten iron temperature 1320 ℃. The weight of molten iron is 105.3 tons, and the weight of scrap steel is 15.2 tons.
[0033] Double slag target alkalinity target 1.4, temperature target 1345 ℃ blowing target; through calculation, lime addition is 1.2 tons, limestone addition is 1.1 tons, ore addition is 2.9 tons; oxygen supply intensity is 3.0m3 / (min·t steel ), gun position 2.9m.
[0034] When the oxygen blowing rate of the converter reaches 14.2%, the flue gas analysis system shows that the CO concentration starts to rise, and when the oxygen blowing rate reaches 23.3%, the CO concentration reaches 27%, and double slag is produced by raising the gun. The measured melting pool temperature was 1355°C, the slag was well melted, and the furnace and slag pouring went smoothly.
Embodiment 2
[0036] 100 tons of converter double slag smelting, furnace input conditions: molten iron C4.31%, Si0.84%, P0.127%, Ti0.138%, molten iron temperature 1337 ℃. The molten iron weighs 102.3 tons, and the steel scrap weighs 8.3 tons.
[0037] Double slag target alkalinity target 1.4, temperature target 1345 ℃ blowing target; through calculation, lime addition is 1.4 tons, limestone addition is 1.2 tons, ore addition is 3.4 tons; oxygen supply intensity is 2.9m3 / (min·t steel ), gun position 2.7m.
[0038] When the oxygen blowing rate of the converter reaches 14.6%, the flue gas analysis system shows that the CO concentration starts to rise, and when the oxygen blowing rate reaches 20.8%, the CO concentration reaches 23%, and double slag is produced by raising the gun. The measured melting pool temperature was 1340°C, the slag was well melted, and the furnace and slag pouring went smoothly.
Embodiment 3
[0040] 100 tons of converter double slag smelting, furnace input conditions: molten iron C4.26%, Si0.89%, P0.127%, Ti0.155%, molten iron temperature 1401 ℃. The molten iron weighs 102.3 tons, and the steel scrap weighs 11.6 tons.
[0041] Double slag target alkalinity target 1.8, temperature target 1345 ℃ blowing target; through calculation, the amount of lime added is 2.6 tons, the amount of limestone added is 1.4 tons, and the amount of ore added is 3.2 tons; the oxygen supply intensity is 2.9m3 / (min·t steel ), gun position 2.7m.
[0042] When the oxygen blowing rate of the converter reaches 17.6%, the flue gas analysis system shows that the CO concentration starts to rise, and when the oxygen blowing rate reaches 27.9%, the CO concentration reaches 25.36%, and double slag is produced by raising the gun. The measured molten pool temperature was 1346°C, the slag was well melted, and the furnace and slag pouring went smoothly.