Long-distance buried oil and gas pipe network electrolytic coupling segmentation method for preventing geomagnetic storm disasters
A technology for geomagnetic storms and oil and gas pipelines, which is used in instruments, data processing applications, forecasting, etc., and can solve problems such as inability to change output polarity, cumulative increase, and burnout.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0090] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. The following description is only for demonstration and explanation, and does not limit the present invention in any form.
[0091] In order to reduce the sudden change point of pipeline geomagnetic storm disaster and reduce the "swallow tail peak" of pipeline PSP, thereby reducing the number of pipeline cathodic protection devices, and in order to reduce the degree of sudden change of PSP at pipeline geomagnetic storm disaster sudden change point, thereby greatly saving pipeline anti-corrosion costs, Improve the ability of buried oil and gas pipelines to defend against geomagnetic storm disasters, prolong the life of pipelines and related equipment, and design a long-distance buried oil and gas pipeline network electrical decoupling and segmentation method to prevent geomagnetic storm disasters, such as figure 1 As shown, the method includes fo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com