Advanced geological forecasting method of shield construction

A technology of advanced geological prediction and shield method, applied in seismic signal processing and other directions, can solve the problems of low detection accuracy and short detection distance, and achieve the effect of reducing limitations and solving the problem of geophone coupling.
CN105301645AActive Publication Date: 2016-02-03BEIJING MUNICIPAL ENG RES INST

Patent Information

Authority / Receiving Office
CN Β· China
Patent Type
Applications(China)
Current Assignee / Owner
BEIJING MUNICIPAL ENG RES INST
Publication Date
2016-02-03

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention relates to the field of advanced geological forecasting of shield tunneling construction and discloses an advanced geological forecasting method in shield tunneling construction processes and a system. The method comprises steps of acquiring reflecting waves and penetrated waves formed when earthquake waves generated by mechanical vibration of a shield tunneling machine during the construction process meet a reflecting interface in the preset position and preset direction so as to form an earthquake data file; using vibration signal data in the moving state of the shield tunneling machine; and carrying out data integration processing and analyzing, thereby forming, outputting and displaying images of front geological conditions of construction of the shield tunneling mechanism. The system can continuously acquire data in real time. There is no need to install devices on a knife disc of the shield tunneling machine. Compared with the prior art, limitation on installation of the devices is eliminated, detection precision can be effectively improved and detection distance can be effectively extended.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to an advanced geological prediction method and system for shield tunneling construction. Background technique

[0002] The construction method of tunnel boring machine has certain particularity and complexity, which brings huge difficulties to its advanced geological prediction. The specific performance is that the roadheader occupies most of the space behind the tunnel face, the site in front of the construction is very small, and the rotation of the cutter head in front needs to maintain a certain pressure, so the side wall behind the face basically does not have the ability to place advanced forecasting detection The conditions of excitation devices and sensors will bring certain difficulties to forecasting techniques, methods and device arrangements. For the earthquake method, the vibration of mechanical excavation is relatively large, and the impact is also great; for the electromagnetic method, the interference current and...

Claims