Reinforcing method for underwater concrete for blocking gate of hydropower station diversion tunnel
A kind of underwater concrete and concrete technology, which is applied in hydropower stations, hydropower, water conservancy projects, etc., can solve the problems of blocking accidents, interfering with construction progress, and high cost of steel gates, achieving good sealing performance, reducing design length, The effect of simplification of construction steps
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0017] The diversion tunnel gate of the hydropower station according to the present invention is used to block the underwater concrete reinforcement method, the main steps of which are as follows:
[0018] (1) Install the door slot and door top formwork. The door slot formwork is welded on the gate body during the gate installation process with 2.5mm iron plate. The door top formwork is molded and reinforced after the gate is installed, and a fixed steel pipe safety protective railing;
[0019] (2) Concrete collecting hopper, conduit and lifting frame are installed, each water inlet tower is installed in place, and imported plugging materials are prepared, and 40t cargo ships, lifeboats, and 20t traffic boats are prepared; concrete conveying equipment is in place;
[0020] (3) The entrance gate is closed. After the gate is closed, two underwater operation groups are carried out at the same time before the gate is opened and after the gate. The operation team needs two groups ...
Embodiment 2
[0027] The diversion tunnel gate of the hydropower station according to the present invention is used to block the underwater concrete reinforcement method, the main steps of which are as follows:
[0028] (1) Install the door slot and door top formwork. The door slot formwork is welded on the gate body during the gate installation process with 2.5mm iron plate. The door top formwork is molded and reinforced after the gate is installed, and a fixed steel pipe safety protective railing;
[0029] (2) Concrete collecting hopper, conduit and lifting frame are installed, each water inlet tower is installed in place, and imported plugging materials are prepared, and 40t cargo ships, lifeboats, and 20t traffic boats are prepared; concrete conveying equipment is in place;
[0030] (3) The entrance gate is closed. After the gate is closed, two underwater operation groups are carried out at the same time before the gate is opened and after the gate. The operation team needs two groups ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com