A method for determining the protection priority of each component in a wide area protection communication system
A communication system and wide-area protection technology, which is applied in the field of determining the protection priority of each component in the wide-area protection communication system, can solve problems such as limited bandwidth, unavailability, and failure to fully utilize the information advantages of the wide-area entire network to achieve accurate and fast Judgment, the effect of bandwidth saving
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0016] A method for determining the protection priority of each component in a wide-area protection communication system, the method is: according to the importance and reliability of each component in the wide-area protection communication system itself, and the incorrect action of the corresponding protection, the distribution weight is used The value and the method of setting the threshold value are used to divide the protection priority of each component in the ground layer, so as to determine the protection priority of each component.
[0017] The components are lines, busbars and transformers.
[0018] For the line, take its own failure rate f l , the load level h and the incorrect action rate u of the corresponding protection 1 And whether it is an inter-station line Link is used as an evaluation index to divide the priority protection level of this component at the center layer.
[0019] For the bus, take its own failure rate f b , Incorrect action rate of ground pr...
Embodiment 2
[0049] Build a wide-area protection communication system model on the OPNET platform, and take a 110KV substation as one of the substations for specific analysis. The substation includes two 110KV incoming lines L 1 and L 2 , 2 sets of 110KV transformer interval (T A and T B ), a 110KV busbar (B 110KV ), a 35KV busbar (B 35KV ), a 10KV busbar (B 10KV ), two 35KV feeders (F 1 and F 2 ), 6 10KV feeders (F 3 ~F 8 ). Classify the components in the station according to the above method. The simulation adopts two different methods to upload protection information under two different communication conditions, and compares the communication delay under the two methods.
[0050] figure 1 It shows that in the case of no fault, two methods are adopted, and it can be clearly seen that the delay time of the method of the present invention is significantly shorter than that of the traditional method, and the wide-area protection can provide protection with different priority leve...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com