A method for rapid maintenance of heavy-duty traffic sections at BRT stations
A traffic and road section technology, which is applied in the field of rapid maintenance of heavy-duty traffic sections at BRT stations, can solve problems such as difficult construction, affecting driving quality, and endangering driving safety, and achieves good long-term use performance, guaranteed use comfort, and improved rutting resistance Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] The technical solution of the present invention is a method for rapid maintenance of heavy-load traffic sections of BRT stations, including the following steps: (1) Cleaning of the base surface: excavating the damaged parts of the original road surface 1 and milling the original pavement layer cleanly , And deal with the severely diseased locations, dry the base surface, fill up the uneven locations, and paste seals 5 on both sides; (2) Apply a layer of 1cm thick high-strength modified resin cement 3 on the base surface to make the layer high-strength modified The resin binder 3 is composed of a high-strength modified resin and a filler. The high-strength modified resin is composed of an epoxy resin and a curing agent, specifically a bisphenol A epoxy resin, wherein the weight ratio of the epoxy resin to the curing agent is 4:1, the curing agent is specifically modified aromatic amine and polyamide, the weight ratio of the two is 1:3, the filler is kaolin, and the weight ...
Embodiment 2
[0023] A method for rapid maintenance of heavy-duty traffic sections of BRT stations, including the following steps: (1) Base surface cleaning: excavate the damaged parts of the original pavement 1, mill the original pavement, and treat the severely damaged locations , The base surface is dried, the uneven position is filled up, and the seal 5 is attached on both sides;
[0024] (2) Apply a layer of 1.3cm thick high-strength modified resin cement 3 on the base surface. This layer of high-strength modified resin cement 3 is composed of high-strength modified resin and filler. The high-strength modified resin contains epoxy resin The weight ratio to the curing agent is 2:1, the curing agent is modified aromatic amine and polyamide, the weight ratio is 1:1, the filler is mineral powder, and the weight ratio of high-strength modified resin to filler is 1 : 0.8, and then pave 4cm-thick OGFC asphalt mixture 2. The OGFC asphalt mixture 2 is a mixture of aggregate, mineral powder, and as...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 