A construction method and low-permeability technology, applied in excavation, infrastructure engineering, construction, etc., can solve problems such as long exposure time of foundation pit excavation, mutual interference between support and excavation machinery, and improve construction progress and excavation efficiency , Improve the efficiency of mechanical use and reduce the number of times

Active Publication Date: 2016-08-24
CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD +1
View PDF3 Cites 14 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to solve the shortcomings of the existing methods such as dewatering first and then excavation, mutual interference between support and excavation machinery, and long exposure time of foundation pit excavation. In low-permeable muddy soil layers, foundation pit dewatering is not set. , save the precipitation period before the excavation of the foundation pit, carry out trough first and then layered and segmented slope excavation on both sides in the excavation of the foundation pit, reduce the interference between the erection of internal supports and mechanical equipment, and improve the excavation in soft soil layers An ultra-wide low-permeability silt deep foundation pit excavation construction method with high construction efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Excavation construction method for super-wide low-permeability silty deep foundation pit
  • Excavation construction method for super-wide low-permeability silty deep foundation pit
  • Excavation construction method for super-wide low-permeability silty deep foundation pit

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0032] see figure 1 , Before the excavation of the foundation pit, complete the foundation pit reinforcement and support erection such as temporary roads, ditches, crown beams, soil reinforcement, bored piles and lattice columns, SMW piles, etc.

[0033] Referring to Figure 2(a), (b), (c), before the surface soil is removed, the surface water should be pumped out of the foundation pit in a timely manner, mechanical equipment and turnover materials should be organized to the site, and a suitable spoil site should be selected at the same time. The better soil used in site leveling is used to build temporary roads. The temporary roads are built on both sides of the foundation pit to ensure that the earth transport vehicles can run normally. At the same time, sufficient steel plates are equipped. When cleaning the topsoil, two excavators are used for excavation, each The excavator is equipped with 3 pieces of 6000×3000×20mm thick steel plates to cooperate with the excavator for th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical field of foundation pit construction, in particular to an excavation construction method for a super-wide low-permeability silty deep foundation pit. The construction method comprises the following steps that the foundation pit is excavated in a low-permeability silty soil layer where foundation pit dewatering is not carried out, the action of earth berm under the super-wide characteristic of the foundation pit is fully used, excavation is conducted in a partitioned and layered mode, the earth berm is reserved by slotting a slot in the middle of the foundation pit, steel supports are erected, and the earth berm is excavated out, so that balance and stability of the earth berm and supporting structures in the foundation pit are ensured; and meanwhile, abnormal conditions of the foundation pit is closely concerned through foundation pit monitoring measurement, and the purposes of reducing interference of the supports to earth excavation equipment and accelerating construction progress are achieved. The stepped continuous excavation supporting construction is adopted, and excavation is conducted in a partitioned and segmented mode, so that layered, segmented, ordered and normalized foundation pit excavation is achieved, machine input is reduced, the number of times of earth relaying transferring is reduced, the machine using efficiency is improved, and repeated dispatching of machines in the excavation process is reduced.

Description

[technical field] [0001] The invention relates to the technical field of foundation pit construction, in particular to an ultra-wide low-permeability mud deep foundation pit excavation construction method. [Background technique] [0002] As we all know, at present, the population and construction of large and medium-sized coastal cities in China are basically saturated in the original planned urban area, the urban area of ​​the city is expanding to the surrounding area, the city is expanding to the inland and along the sea, and the construction of reclamation tidal flat areas is increasing. Traditionally planned road construction is mostly a combination of roads and bridges and culverts. There are also many large-scale sunken passages in tidal flat areas to dredge urban roads in order to plan city appearance and city appearance in urban construction. However, construction in areas with poor geological conditions such as tidal flats At this time, according to the traditional ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/02
CPCE02D17/02
Inventor 徐明发刘习生曲建华张红乾梁贤伟吕东强
Owner CHINA RAILWAY SHANGHAI ENGINEERING BUREAU GROUP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products