A kind of improvement method of solid wood board
A solid wood board and board technology, applied in wood treatment, wood heating, wood processing equipment, etc., can solve the problems of inaccurate control of wood moisture content, surface cracks and end cracks of the board, so as to avoid surface discoloration and ensure the quality of the board , processing uniform effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] A method for improving a solid wood board, comprising the following steps:
[0022] (1) Blank production: select fresh wood, and form it into a plate blank; place the plate blank in a metal frame, and compact it around;
[0023] (2) Primary high-pressure curing: place the metal frame with the plate blank in the steam chamber, heat it with closed steam, the pressure is 8 atmospheres, the indoor temperature is 170°C, and the processing time is 1h;
[0024] (3) Primary drying: move the metal frame with the plate blank into the drying room, control the temperature of the drying room at 80°C, the pressure is 6 atmospheres, and the treatment time is 2 hours;
[0025] (4) Carbonization treatment: put the metal frame with the plate blank into the carbonization kiln, pressurize the top according to 1-2t / m2, and close the door and the inlet and exhaust ports of the carbonization kiln; then raise the temperature to 100°C, keep it for 4 hours, and keep the indoor humidity at 30%; ...
Embodiment 2
[0028] A method for improving a solid wood board, comprising the following steps:
[0029] (1) Blank production: select fresh wood, and form it into a plate blank; place the plate blank in a metal frame, and compact it around;
[0030] (2) Primary high-pressure curing: place the metal frame with the plate blank in the steam chamber, heat it with closed steam, the pressure is 6 atmospheres, the indoor temperature is 150°C, and the processing time is 4 hours;
[0031] (3) Primary drying: move the metal frame with the plate blank into the drying room, control the temperature of the drying room at 60°C, the pressure is 5 atmospheres, and the treatment time is 4 hours;
[0032] (4) Carbonization treatment: put the metal frame with the plate blank into the carbonization kiln, pressurize the top according to 1-2t / m2, and close the door and the inlet and exhaust ports of the carbonization kiln; then raise the temperature to 80°C, keep it for 4 hours, and keep the indoor humidity at 2...
Embodiment 3
[0035] A method for improving a solid wood board, comprising the following steps:
[0036] (1) Blank production: select fresh wood, and form it into a plate blank; place the plate blank in a metal frame, and compact it around;
[0037] (2) High-pressure curing: place the metal frame with the plate blank in the steam chamber, heat it with closed steam, the pressure is 7 atmospheres, the indoor temperature is 160°C, and the processing time is 3 hours;
[0038] (3) Drying: move the metal frame with the plate blank into the drying room, control the temperature of the drying room at 70°C, the pressure is 5.5 atmospheres, and the treatment time is 3 hours;
[0039] (4) Carbonization treatment: put the metal frame with the plate blank into the carbonization kiln, pressurize the top according to 1-2t / m2, and close the door and the inlet and exhaust ports of the carbonization kiln; then raise the temperature to 900°C, keep it for 5 hours, and keep the indoor humidity at 25%; then rais...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com