Construction method for casing pipes of offshore oil drilling platform
A riser, offshore oil technology, applied in water conservancy projects, artificial islands, underwater structures, etc., can solve problems such as construction efficiency impact, deviation, and impact on the performance of a single riser
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] A construction method for a water riser on an offshore oil drilling platform, which includes the following specific construction techniques:
[0039] 1) Based on the number of wellheads of the offshore oil drilling platform, a corresponding number of riser conduits 1 are taken, and a plurality of auxiliary installation end blocks 2 are respectively welded on the upper end of each riser conduit 1; Among the plurality of riser conduits 1, any two adjacent riser conduits 1 are correspondingly provided with a set of guide ribs 5;
[0040] 2) Transport the hoisting equipment, piling equipment, and the water riser 1 and guide rib 5 in step 1) to the offshore oil drilling platform;
[0041] 3) Suspend the hoisting equipment on the auxiliary installation end block of the first water riser 1, so that the above water riser 1 is placed inside the wellhead of the offshore oil drilling platform, and the upper end of the above water riser 1 is carried out. The welding of the guide r...
Embodiment 2
[0058] As an improvement of the present invention, in the auxiliary installation end block 2, the first connecting groove body 3 extends between the two side end surfaces of the auxiliary installation end block 2; the width of the guide rib 5 is larger than that of the auxiliary installation Width of end block 2. By adopting the above technical solution, it can improve the contact area between the guide rib and the water riser, so that its auxiliary guiding effect between two adjacent water riser can be improved.
[0059] The remaining features and advantages of this embodiment are the same as those of Embodiment 1.
Embodiment 3
[0061] As an improvement of the present invention, such as figure 2 As shown, the piling equipment in the step 2) includes a piling hammer 6 and a piling hammer balance bar 7, and piling hammer hangers 8 are arranged on both sides of the piling hammer 6, and the piling hammer 6 is fixed inside the piling hammer hanger 8. Both the hammer 6 and the pile hammer hanger 8 are suspended on the piling hammer balance bar 7; a top drive 9 is arranged above the piling hammer balance bar 7, and a balance bar crane for hanging the piling hammer balance bar is connected above the top drive 9. Cables and conduit slings for suspending riser conduits; under the piling hammer 6, a hammer-in short 10 extending in the vertical direction is provided, and the side end surface of the hammer-in short 10 is provided with multiple Extended positioning grooves 11, a plurality of positioning grooves 11 are rotationally symmetrical about the axis of the hammer-in shorting 10; each positioning groove 11 ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 