Embodiment Construction
[0018] In this embodiment, the large-volume foundation is divided into four pouring areas at equal distances from left to right. Each pouring area is left with a slow pouring area, and the slow pouring area is left on the right side of the pouring area. The length of the slow pouring area is 600-800mm. During the construction, the concrete in the four pouring areas shall be poured separately, and the concrete in each slow pouring area shall be poured after 10 to 12 hours after the concrete pouring in each area is completed. The strength is increased by one strength level, and the concrete in the slow pouring area is mixed with a retarder, and the retarding time of the concrete in the slow pouring area is 4h longer than that of the poured concrete.
[0019] Bury tensile structural steel bars at the junction of the slow pouring area and the non-slow pouring area. The diameter of the tensile structural steel bars is 6-8mm, and the spacing of the tensile structural steel bars is 50...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle diameter | aaaaa | aaaaa |
| diameter | aaaaa | aaaaa |