A construction method and technology of mixing materials, which are applied in the directions of buildings, roads, and coagulating pavements laid on site, can solve the problems of unstable quality of SMA mixture, hindering the large-scale application of SMA, and uneven distribution of fiber agglomeration. The effect of simplifying the mixing production process, reducing the emission of asphalt smoke and improving the economy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0052] The embodiment of the present invention provides a kind of SMA mixture, comprises: the SBS modified asphalt (I-D) of 1 weight part, the aggregate of 16.07 weight parts (asphalt ratio=SBS modified asphalt / (aggregate+limestone mineral powder)=5.6 %), 1.79 parts by weight of mineral powder and 0.005 parts by weight of Evotherm M1 surfactant; wherein the aggregate is taken from basalt produced in Chengde, Hebei, and the gradation is shown in Table 4.
[0053]The preparation method of described SMA mixture, comprises the following steps:
[0054] Step 1: take a certain amount of SBS modified asphalt, take by weighing 0.5% surfactant with the weighed amount of the SBS modified asphalt (I-D), join in the described SBS modified asphalt and stir for 5min, then place Dry in an oven at 165°C for later use;
[0055] Step 2: Weigh the aggregate that is 16.07 times the weighted amount of the SBS modified asphalt described in step 1, keep the temperature in a drying oven at 155°C for...
Embodiment 2
[0068] The embodiment of the present invention provides a kind of SMA mixture, comprises: the SBS modified asphalt (I-D) of 1 weight part, the aggregate of 16.43 weight parts (asphalt ratio=SBS modified asphalt / (aggregate+limestone mineral powder)=5.6 %), 1.43 parts by weight of mineral powder and 0.006 parts by weight of Evotherm M1 surfactant; wherein the aggregate is taken from Shandong basalt, and the gradation is shown in Table 4.
[0069] The preparation method of described SMA mixture, comprises the following steps:
[0070] Step 1: take a certain amount of SBS modified asphalt, take by weighing 0.6% surfactant with the weighed amount of the SBS modified asphalt (I-D), join in the described SBS modified asphalt and stir for 10min, then place Dry in an oven at 155°C for later use;
[0071] Step 2: Weigh the aggregate (asphalt ratio is 5.6%) that is 16.43 times the amount of SBS modified asphalt in step 1, and keep the temperature in a drying oven at 145°C for 4h, and th...
Embodiment 3
[0076] The embodiment of the present invention provides a kind of SMA mixture on-site mixing and construction method, comprising: 1 weight part of SBS modified asphalt (I-D), 15.43 weight parts of aggregate (asphalt ratio=SBS modified asphalt / (aggregate+ Limestone mineral powder)=5.7%), 2.11 parts by weight of mineral powder and 0.005-0.006 parts by weight of surfactant; wherein the aggregate is taken from basalt produced in Shandong, and the gradation is shown in Table 4.
[0077] The preparation method of described SMA mixture is exampled with the production of mixture in on-site mixing building, comprising the following steps:
[0078] Step 1: Take 0.5%-0.6% surfactant of the mass of SBS modified asphalt and add it into the asphalt tank and stir for later use;
[0079] Step 2: Weigh the aggregate (the ratio of asphalt is 5.7%) to 15.43 times that of the SBS modified asphalt in step 1, heat it to 145-155°C, and add it to the mixing building for dry mixing;
[0080] Step 3: ...