Design method for power transmission and transformation project cost software based on BIM technology

A technology of engineering cost and design method, applied in the field of substation engineering, can solve the problems of increased cost, long time, no data basis, etc., to achieve the effect of improving labor efficiency, reducing settlement disputes, and strengthening management level
CN106097149AInactive Publication Date: 2016-11-09STATE GRID CORP OF CHINA +1

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
STATE GRID CORP OF CHINA
Publication Date
2016-11-09
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
Patent Text Reader

Abstract

The invention provides a design method for power transmission and transformation project cost software based on a BIM technology. The cost budge of a power transmission and transformation project is realized through software. The design method has the following advantages that 1, the design is optimized and investment management and control are enhanced; 2, construction simulation and information sharing are performed so that the collaboration efficiency can be enhanced; 3, the professional construction problems of the electric power industry can be effectively solved; 4, the project cost is intelligently calculated so that the efficiency of labor can be enhanced and the management level can be enhanced; and 5, power transmission and transformation project data information is shared so that the basis is provided for industry decision making.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the technical field of substation engineering, in particular to a design method for cost software of substation engineering. Background technique

[0002] At present, the construction design of power transmission and transformation infrastructure projects in power grid projects adopts two-dimensional plane construction design. Design errors, missing items, and professional cross-repetition occur frequently on site, which increases the number of engineering design changes, serious rework and reconstruction on the construction site, and makes investment control difficult. increase.

[0003] The project cost management in my country's construction field has been in the following two situations for a long time:

[0004] Two-dimensional drawings + manual calculation + manual pricing. That is: the determination of project cost, the management of engineering materials and machines, and the management of project settlement are all ma...