Construction method of foundation grouting for continuous steel structure aqueduct pier in rich water area
A construction method and aqueduct technology, applied in infrastructure engineering, construction, etc., can solve problems such as excessive water inflow and inability to construct, and achieve the effect of ensuring construction quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0032] like figure 1 As shown, the 1#, 5#, and 9# excavated piles are near-water piles, and the grouting holes are arranged in a single row; the hole spacing is 3.0m, and there are a total of 9 holes with a hole diameter of 91mm. The opening elevation of each grouting hole in the GG2# pier foundation is the existing ground, and the hole depth is 24m, of which the effective hole depth of a single hole is 15m, and the ineffective hole depth is 9m; the total hole depth is 216m, of which the effective hole is 135m, and the ineffective hole depth is 81m. The grouting is divided into two phases of construction, the first phase is 1#~3# holes, 7#~9# holes; the second phase is 4#~6# holes. Each phase of grouting is divided into three sequences of construction, the specific sequence see figure 1 .
[0033] Based on the principles of easy control of construction quality, proximity, convenience, and economy, and on the premise of ensuring construction needs and project completion on sc...