A kind of prefabricated preparation process of prefabricated wall without facing layer

A preparation process and prefabricated technology, applied in building components, buildings, building structures, etc., can solve the problems of prefabricated buildings that are difficult to popularize, high incremental costs, and difficult to guarantee quality, and achieve simple and fast production and construction The process is simple and convenient, and the effect of cost saving

Active Publication Date: 2017-12-29
QINGDAO CREEK NEW ENVIRONMENTAL PROTECTION MATERIAL
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, at present, the prefabricated wall generally adopts a sandwich structure. This structure is to connect the 5-8cm thick concrete plate on the outside of the insulation board with the concrete of the main structure through the connector passing through the insulation board. The sandwich structure There are cumbersome production, high cost, and low safety system. There is no implementation standard for the connectors used to fix the outer 5-8cm thick concrete slab, the quality is difficult to guarantee, and a large number of cold bridges are formed. At present, all rely on imports, and the cost is high. No less, it is difficult to promote the current prefabricated buildings, and the incremental cost remains high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of prefabricated preparation process of prefabricated wall without facing layer
  • A kind of prefabricated preparation process of prefabricated wall without facing layer
  • A kind of prefabricated preparation process of prefabricated wall without facing layer

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0055] The present invention will be further described below in conjunction with the accompanying drawings.

[0056] figure 1 A prefabricated self-insulation wall body is shown, the wall body includes a concrete wall body 3 and an insulation board 4, a protective layer is arranged on the outside of the insulation board 4, and an insulation board is arranged on the outside of the concrete wall body 3.

[0057] The protective layer can be cement mortar or paste cement sheet or calcium silicate board, glass magnesium board, cement fiber thin felt.

[0058] figure 1 It shows the horizontal structure of the wall, that is, the schematic diagram of the preparation of the frontal method. In fact, the wall is vertical when it is installed.

[0059] Preferably, the insulation material 4 of the insulation board is a vacuum insulation board.

[0060] The present invention further discloses the construction process method of the heat preservation board:

[0061] Insulation board is pla...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a forehead preparation process for a finish coat free assembled wall. The wall comprises a concrete wall body and a heat-preservation plate, wherein the heat-preservation plate is arranged outside the concrete wall body; a protection layer is arranged outside the heat-preservation plate. According to the forehead preparation process, the assembled self-heat-preservation wall plate is produced by using a heat-preservation plate forehead construction process, and connecting parts for connecting external plates with inside and outside components in a conventional sandwich structure are not used, so that the cost can be greatly lowered, the production efficiency can be improved, the self-weight of a building can be reduced, and large-scale popularization of assembled buildings can be ensured.

Description

technical field [0001] The invention relates to the technical field of building materials, in particular to the field of manufacturing method, design and installation of a novel prefabricated wall. Background technique [0002] As the largest developing country, my country's energy consumption per unit of GDP is more than twice the world's average level. Faced with an increasingly severe energy security situation, the country is vigorously promoting energy conservation and emission reduction in various fields. Building energy consumption accounts for 20-30% of my country's total energy consumption, so building energy conservation is particularly important. The latest building energy-saving standard is that the northern regions such as Beijing, Tianjin, Shandong, Hebei, Xinjiang and other provinces have achieved 75% energy-saving standards. Most of the urban residential buildings in most areas require 65%, and very few areas require 50%. Due to the late development of buildi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04C2/288E04B1/41
CPCE04B1/4157E04C2/288
Inventor 翟传伟李壮贤侯钦鹏
Owner QINGDAO CREEK NEW ENVIRONMENTAL PROTECTION MATERIAL