A high-rise building integrated construction robot
A technology of high-rise buildings and robots, which is applied in the direction of construction, building construction, and building materials processing, and can solve the problems of dismantling, stacking, re-planning, re-installation, and re-commissioning, which are time-consuming and labor-intensive, hindering the standardization of building construction, and the automation and intelligence of industrialization. Automated production lines, affecting construction progress, construction quality and construction safety, etc., to achieve the effect of fully automatic movement and construction, improving construction efficiency and safety, and optimizing the construction environment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] like figure 1 As shown, a high-rise building integrated construction robot provided by Embodiment 1 of the present invention includes a carrying platform 1, a stair-climbing robot, a control system, and first-type facilities 2, second-type facilities 3 and pipelines mounted on the carrying platform 1 system. The carrying platform 1 is used to carry various functional construction equipment, construction facilities and turnover materials. The climbing robot is used to lift and lower the carrying platform 1 and has multiple sets. The control system is used to integrate the equipment on the construction robot for the high-rise building. For overall regulation and setting, the carrying platform 1 includes a multi-layer construction platform 5 for personnel and machine construction operations. The first type of facility 2 is fixedly installed on the construction platform 5, and the second type of facility 3 can be moved on the construction platform 5. The pipeline system is...
Embodiment 2
[0042] Compared with the first embodiment, the second embodiment differs in that the carrying platform 1 in the second embodiment is provided with a moving guide rail 6, such as Figure 4 As shown, the carrying platform 1 and the moving guide rail 6 are all prefabricated in advance according to the building shape and construction requirements. The moving guide rail 6 is divided into a horizontal track and a vertical track, and a construction track section 7 detached from the main track is provided at intervals, thus ensuring The unobstructed operation of the equipment on the main track, parameters such as the shape, route and length of the track are all pre-stored in the control system; the second type of facility 3 in the second embodiment is movably installed on the moving guide rail 6 through the mobile device and can move freely. Correspondingly, the second type of facility 3 is provided with a construction controller connected to the host, and the construction controller c...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 