Secondary precise leveling device and method of underground space prefabricated member
A prefabricated component and underground space technology, applied in the direction of infrastructure engineering, construction, etc., can solve the problems of pile top elevation dislocation and pile top elevation that cannot be adjusted again, and achieve large market promotion and application value, simple structure, and convenient The effect of the operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] Such as figure 1 , figure 2 As shown, the present invention is a secondary precision leveling device for prefabricated components in underground space, including the initial leveling plate at the bottom of the pile and the leveling gasket at the top of the pile located in the prefabricated pile hole, the upper end of the initial leveling plate at the bottom of the pile is provided There are prefabricated components, and the upper end of the prefabricated components is provided with a pile top leveling gasket for secondary adjustment of the pile top elevation.
[0047] The prefabricated component 2 described in this embodiment includes prefabricated piles and prefabricated beams, which are arranged on the upper end of the leveling pad 3 at the bottom of the pile, and the initial leveling pad 3 at the bottom of the pile is used to reduce the top of the cushion 4 at the bottom of the hole. The height difference between the surface elevation H2 and the design pile bottom ...
Embodiment 2
[0051] This embodiment is further limited on the basis of Embodiment 1, the thickness of the initial leveling backing plate 3 at the pile bottom is greater than or equal to the thickness of the pile top leveling pad 1, here the initial leveling backing plate 3 at the pile bottom, the pile top The specifications of the leveling pad 1 are limited. The specific structure of both can be a steel plate structure, but according to the installation position of the two, the leveling deviation required to be achieved is different. The thickness of the initial leveling pad 3 at the pile bottom is greater than or equal to the pile The thickness of the top leveling gasket 1 and the initial leveling plate 3 at the bottom of the pile mainly realize the initial leveling between the cushion layer 4 at the bottom of the hole and the connection end of the prefabricated component 2, while the pile top leveling gasket 1 is installed on the prefabricated After component 2, the pile top leveling gask...
Embodiment 3
[0053] This embodiment is further limited on the basis of the above-mentioned embodiments, the pile bottom preliminary leveling backing plate 3 is formed by connecting a plurality of backing plates with bolts, and at least two bolt holes 6 are symmetrically provided on the backing plate. The inner surface of the bolt hole 6 is provided with an internal thread, which facilitates the connection between the backing plates by bolts, and at the same time realizes the adjustment of the number of backing plates, thereby simultaneously adjusting the thickness of the backing plate 3 for the initial leveling of the pile bottom, and can be quickly leveled , reduce the height difference between the top surface elevation H2 of the hole bottom cushion and the design pile bottom elevation H3, and avoid the possibility that prefabricated components cannot be assembled due to excessive height differences.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com