Ultrathick coral chip-contained stratum foundation pit water stop structure and method
A coral debris and water-stopping technology, which is applied to underwater structures, infrastructure engineering, water conservancy projects, etc., can solve the problem that water-stopping curtains are difficult to block groundwater seepage, typhoons, heavy rains, and tidal effects. The problem of large coefficients, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] see figure 1 , and see in conjunction with Figure 2 to Figure 7 , this embodiment discloses a super-thick coral-debris-containing stratum foundation pit water-stopping structure, which is applied to the island area. The island area has an ultra-thick coral-debris-containing stratum. The coral clast-bearing sand layer 2 located below the soil layer 1, the ultra-thick coral clast-bearing formation has the characteristics described in the background art. The super-thick foundation pit water-stopping structure containing coral debris includes three-axis mixing pile water-stopping curtains for lateral water-stopping arranged around the foundation pit 3, and water-stopping curtains for bottom water-stopping arranged at the bottom of the foundation pit The full reinforcement structure 4 in the three-axis mixing pile pit, and the high-pressure rotary spraying pile 5 arranged between the water-stop curtain 3 of the three-axis mixing pile and the full reinforcement structure 4 in...
Embodiment 2
[0047] This embodiment discloses a water-stopping method for foundation pits in super-thick coral-debris-containing strata. The water-stopping structure for foundation pits in super-thick coral-debris-containing strata as described in Embodiment 1 is adopted. The method includes the following steps:
[0048] The first step is to construct a three-axis mixing pile water-stop curtain 3 for lateral water-stop around the foundation pit;
[0049] The second step is to construct a three-axis mixing pile reinforcement structure 4 at the bottom of the foundation pit to stop water at the bottom of the pit;
[0050] In the third step, the high-pressure rotary grouting pile 5 is driven between the water-stop curtain 3 of the three-axis mixing pile and the reinforcement structure 4 in the three-axis mixing pile pit.
[0051] The water-stopping method for foundation pits in ultra-thick coral debris-containing strata provided in this example adopts a combination of lateral water-stopping an...