Unlock instant, AI-driven research and patent intelligence for your innovation.

A fast-assembly supporting structure of section steel frame without welding for initial support construction of tunnel

A technology of supporting structure and section steel, applied in tunnels, tunnel linings, shaft equipment and other directions, can solve the problems of difficult quality assurance, slow construction speed, pollution, etc., and achieve the effect of convenient connection and construction, convenient construction, and convenient installation and use.

Active Publication Date: 2019-02-05
CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] Aiming at the defects in the above-mentioned prior art, the purpose of the present invention is to solve the above-mentioned insufficiencies in the background technology, and to provide a steel frame steel frame welding-free rapid assembly support structure for the initial support construction of the tunnel, which is not only simple in structure, but also easy to assemble , and can effectively avoid related problems such as slow construction speed, pollution, and difficult quality assurance caused by tunnel welding construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A fast-assembly supporting structure of section steel frame without welding for initial support construction of tunnel
  • A fast-assembly supporting structure of section steel frame without welding for initial support construction of tunnel
  • A fast-assembly supporting structure of section steel frame without welding for initial support construction of tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0034] Depend on Figure 1 to Figure 2A structural schematic diagram of a weld-free quick-assembly support structure of steel frame for tunnel initial support construction is shown. It can be seen that the present invention is mainly used for bearing during the initial construction of the tunnel. Sectional steel arch A, each section steel section A is anchored on the tunnel wall through the locking foot anchor pipe connecting device B; adjacent section steel arches A are connected to each other by longitudinal connection device C; in order to facilitate each section of the present invention The fa...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a sectional steel frame welding-free fast assembly support structure for tunnel primary support construction. The sectional steel frame welding-free fast assembly support structure comprises a plurality of trusses of grid steel arch frames arranged in the longitudinal direction of a tunnel at intervals; each truss of grid steel arch frame is anchored on the tunnel wall through a lock pin anchor pipe connecting device; and the adjacent grid steel arch frames are mutually connected through a longitudinal connection device. The sectional steel frame welding-free fast assembly support structure has the advantages that the structure is simple; the installation and the use are convenient; through the splicing connection among the grid steel arch frames, the longitudinal connection device and a lock pin device, the welding is avoided; relevant problems of low construction speed, pollution, difficult quality guarantee and the like caused by welding are solved; meanwhile, a steel plate is welded in advance on the grid steel arch frames; holes are reserved in the steel plates; holes can be used for guiding hole drilling; and the construction is convenient.

Description

technical field [0001] The invention relates to a tunnel primary support device, which belongs to the technical field of tunnel construction engineering, and in particular to a weld-free quick-assembly support structure of section steel frame used for tunnel primary support construction. Background technique [0002] At present, composite lining is widely used in tunnel engineering in my country. According to the design concept of the new Austrian method, the primary support is the main load-bearing structure. The initial support of the tunnel is a joint support system composed of shotcrete, anchor rods, and steel frames. The steel frame has greater support strength and stiffness, which can significantly enhance the initial support capacity. In order to increase the overall stability of each steel frame, longitudinal connecting steel bars are often used to connect adjacent steel frames; in order to anchor the steel frame in the deep part of the surrounding rock and give full...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/18E21D11/34E21D20/00
CPCE21D11/18E21D11/34E21D20/003
Inventor 肖明清焦齐柱廖辉杨剑
Owner CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More