Construction method of inner excavated abutment
A construction method and abutment technology, applied in excavation, earthwork drilling, infrastructure engineering and other directions, can solve the problems of large construction site, large excavation height, slipping and other problems, and achieve the effect of small construction site and ensuring construction safety.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0022] For the construction method of excavating the inner abutment, firstly, the dangerous rocks on the outer side slope of the tunnel are manually removed, the side slope is temporarily supported (back pressure, filling joints and anchor spraying support), the loose bodies on the outer side slope of the tunnel are cleaned, and the foundation trench is opened. Excavation (excavation to the bottom of the cap), construction of excavated piles, construction of the cap, construction of the platform body, permanent support of the slope (grid beam anchor cable).
[0023] The specific construction method is:
[0024] 1. First, clean up the dangerous rocks on the slope outside the tunnel, and then seal them with plain spraying C25 concrete, with a spraying thickness of 8cm;
[0025] 2. Bolt and shotcrete support is carried out on the outer slope of the tunnel from top to bottom. The anchor rod adopts φ22mm mortar anchor rod. The length of the mortar anchor rod is 4.5m. Net, the grid...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com