Reinstallation process of anti-subsidence inspection well
An anti-subsidence and inspection well technology, applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve the problems of surrounding road subsidence, hidden dangers, poor connectivity, etc., achieve precise and rigorous backfilling process, prevent disasters, and overcome low-lying deformation effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The present invention will be further described below in conjunction with accompanying drawing:
[0031] Such as Figure 1 to Figure 5
[0032] The construction process is as follows:
[0033] 1. Prefabricated reinforced concrete anti-settling concrete cover plate, with dimensions ranging from 1000×1000×200mm to 2000×2000×200mm, which can be manufactured according to the actual situation. The revision center reserves the size of the manhole cover according to the specifications of the manhole cover installed. Taking the straw hat type manhole cover of model DN650 as an example, the reinforced concrete anti-settling concrete cover plate is as follows: figure 1 shown.
[0034] 2. Cut the road surface, take the well chamber as the center, cut the road surface according to the size of the reinforced concrete anti-settling concrete cover plate, increase the length of each side by 200mm, pay attention to the neatness of the road surface cutting, remove the original well co...