Trolley steel end mold for cingulum waterstop positioning and secondary lining construction method
A secondary lining and waterstop technology, which is applied in shaft lining, tunnel lining, earthwork drilling and mining, etc., can solve the problem of difficulty in ensuring the installation quality of mid-buried waterstop, difficulty in ensuring the installation quality of mid-buried waterstop, Affect the waterproof effect of the buried waterstop and other issues, and achieve the effect of high practical value, simple structure and shortened construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] Such as figure 1 , figure 2 , image 3 Shown is a trolley steel end mold for positioning a buried waterstop. The trolley steel end mold includes multiple sets of arc-shaped steel formwork, and the multiple sets of arc-shaped steel formwork are connected to each other along the top of the trolley to the two sides of the trolley. Laminating and laying, multiple groups of arc-shaped steel formworks form trolley steel end forms with the same cross-sectional shape as the constructed tunnel, and a seal for sealing is arranged between the trolley steel end forms and the primary support structure 10 of the constructed tunnel. The sealing layer, the thickness of the sealing layer is not less than the distance between the outer edge of the steel end form and the primary support structure 10;
[0040] Said arc steel formwork of every group comprises inner arc steel formwork and outer arc steel formwork, and said inner arc steel formwork comprises inner panel 1-1 connected on th...
PUM