A two-way reinforcement method for coal pillars in gob-side roadway
A technology for coal pillars and roadway excavation, which is applied in the field of two-way reinforcement of coal pillars in gob-side roadway excavation, can solve problems such as the inability to realize two-way reinforcement in one-way construction, and achieve the effects of wide practical value, enhanced bearing capacity and stability, and easy realization.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach
[0027] Specific implementation method: In the gob-side roadway work, after the coal mining work in the upper section of the mining face is completed, the construction of the gob-side roadway in the lower section of the mining face will be carried out. After the roadway is excavated, the surrounding rock stress will Redistribution, the coal gangue in goaf 1 in the upper section is continuously compressed, the goaf deforms and collapses, and the stress gradually returns to the original rock stress. A certain range of broken areas are reserved on both sides of the coal pillar 2, and the load on the roof Decrease in ability. The invention provides a method for bidirectional reinforcement of coal pillars in gob-side roading, which comprises the following steps,
[0028] The invention provides a method for bidirectional reinforcement of coal pillars in gob-side roading, which comprises the following steps,
[0029] a. Newly excavate a roadway on the side close to the goaf, set a re...