Construction method of hole regreening on high slope of mining face
A construction method and mining surface technology, which are applied in the fields of botanical equipment and methods, excavation, infrastructure engineering, etc., can solve the problems such as the weak combination of mixed dry materials and slopes, and achieve the effect of not easily falling.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] A construction method for regreening holes in high slopes on mining faces, the specific steps are as follows:
[0038] 1) Clean up dangerous rocks on the slope to eliminate hidden dangers in later construction;
[0039] 2) Construction of the anchor rod of the active net system;
[0040] 3) Carry out hole drilling construction;
[0041] 4) filling the nutrient soil in the hole;
[0042] 5) Climbing plants are planted in the hole;
[0043] 6) Construction of active protective nets on high slopes;
[0044] 7) Bind the climbing plants with the active protection net;
[0045] 8) Carry out irrigation system construction;
[0046] Described 8th) step concrete construction steps are as follows:
[0047] (1) Construction of the pumping station. Firstly, the construction of the pumping station requires the lofting of the pumping station. According to the drawings, the axis or outline axis of the water pump, pump room, and water inlet and outlet buildings, as well as the po...