BIM technology-based reservoir formation verification method
A verification method and reservoir technology, applied in image data processing, special data processing applications, instruments, etc., can solve problems such as difficult to express intuitively, lack of sharing and intuitiveness, and low work efficiency, so as to improve intuitiveness and accuracy , Improve effectiveness and operability, improve work efficiency and effectiveness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0023] The technical solution of the present invention is further described below, but the scope of protection is not limited to the description.
[0024] The present invention provides a method for demonstrating reservoir formation conditions based on BIM technology. The digital analysis method based on BIM technology includes the following steps:
[0025] Step 1: Through BIM technology, based on the preliminary results of the previous geological survey combined with the surface survey, geological drilling, connection test and electrical prospecting and other drilling or geophysical methods in the engineering design stage, the basic test data and drawings on the site are obtained, and the 3D topographic mapping is established. Model and three-dimensional geological body model, and pass the relevant review. The BIM model includes watershed, stratum lithology, geological structure, groundwater burial and drainage conditions, sinkholes, water elimination points, karst pipelines ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More